X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0885082601002

Well Details

Well ID: 0885082601002
Loading map...
Location: 00/01-26-088-08W5/2
Location Alias: 00/01-26-88-08 W5M
Location Alias 2: 00/01-26-088-08 W5/02
Country: Canada
Province: Alberta
Township: 088
Meridian: 5
Range: 08
Section: 26
County/Municipality: Municipal District of Opportunity No. 17
Well Name: NUMAC GIANT REEF REDE 1-26-88-8
Operator Name: Devon Canada Corporation
License Number: 0138296
License Date: 1989-01-18
License Status: RecCertified
Spud Date: 1989-02-17
Final Drill Date: 1989-03-18
Well Total Depth: 1545.00 m
Surface Hole Latitude: 56.655785
Surface Hole Longitude: -115.147336

For data sources see[1][2]

Well History

Date Event
1989-01-18 Obtained License
1989-02-19 Surface Casing Operation Performed
1989-02-24 Intermediate Casing Operation Performed
1989-03-08 Direction Drilling Operation Performed - Deviate
1989-03-11 Lost Circulation Occurred
1989-03-18 Finished Drilling
1989-03-18 Well Log Performed
1989-03-18 Well Mode changed to Drilled and Cased
1989-03-19 Drill Stem Test Performed
1989-03-19 Well Log Performed
1989-03-21 Liner Casing Operation Performed
1989-03-21 Rig Released
1989-03-24 Well Log Performed
1989-03-27 Well Log Performed
1989-03-28 Perforation Treatment Performed - Jet Perforation
1989-03-28 Well Began Production
1989-03-28 Well Fluid changed to Crude Oil
1989-03-28 Well Mode changed to Pumping
1989-03-29 Well Fluid changed to Crude Oil
1989-03-29 Well Mode changed to Suspended
1992-02-14 Well Log Performed
1992-02-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-02-15 Plug Back Performed
1992-02-15 Well Abandoned
1992-02-15 Well Fluid changed to Crude Oil
1992-02-15 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1989-03-08 1070.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-03-28 Perforation 1501.50 1502.70 13
1992-02-15 Packing Device Capped w/Cement 1489.00 1497.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 675 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1989-03-11 Lost Circulation 1232.00 1254.00

For data sources see[7]

References