X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0885082004000

Well Details

Well ID: 0885082004000
Loading map...
Location: 00/04-20-088-08W5/0
Location Alias: 00/04-20-88-08 W5M
Location Alias 2: 00/04-20-088-08 W5/00
Country: Canada
Province: Alberta
Township: 088
Meridian: 5
Range: 08
Section: 20
County/Municipality: Municipal District of Opportunity No. 17
Well Name: MBOG REDEARTH 4-20-88-8
Operator Name: Surge Energy Inc.
License Number: 0014484
License Date: 1957-12-20
License Status: Suspension
Spud Date: 1958-08-14
Final Drill Date: 1958-09-04
Well Total Depth: 1485.90 m
Surface Hole Latitude: 56.640988
Surface Hole Longitude: -115.247884

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1957-12-20 Obtained License
1958-09-04 Finished Drilling
1958-09-04 Well Mode changed to Drilled and Cased
1958-09-05 Drill Stem Test Performed
1958-09-07 Production Casing Operation Performed
1958-09-09 Perforation Treatment Performed - Bullet Perforation
1958-09-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-09-11 Well Began Production
1958-09-11 Well Fluid changed to Crude Oil
1958-09-11 Well Mode changed to Flowing
1958-12-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1959-11-12 Well Fluid changed to Crude Oil
1959-11-12 Well Mode changed to Suspended
1963-09-01 Well Fluid changed to Crude Oil
1963-09-01 Well Mode changed to Pumping
1988-12-31 Well Fluid changed to Crude Oil
1988-12-31 Well Mode changed to Suspended
1997-06-14 Well Log Performed
1997-09-19 Well Log Performed
1997-09-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-09-27 Well Log Performed
1997-12-03 Well Began Injection
1997-12-03 Well Fluid changed to Water
1997-12-03 Well Type changed to Injection
2007-04-12 Well Fluid changed to Water
2007-04-12 Well Mode changed to Suspended
2007-04-12 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-09-09 Bullet Perforation 1274.40 1282.60 13
1958-09-09 Bullet Perforation 1285.60 1286.30 13
1958-09-09 Bullet Perforation 1293.60 1298.40 13
1958-09-10 Acid Treatment 1274.40 1298.40 0
1958-12-13 Packing Device Capped w/Cement 1292.40 1292.40 0
1997-09-23 Acid Treatment 1274.40 1286.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 3442 0.0 0.0 0.0
1968 2732 0.0 0.0 0.0
1969 4064 0.0 0.0 0.0
1970 6488 0.0 0.0 0.0
1971 6782 0.0 0.0 0.0
1972 7074 0.0 0.0 0.0
1973 8101 0.0 0.0 0.0
1974 7990 0.0 0.0 0.0
1975 8340 0.0 0.0 0.0
1976 8256 0.0 0.0 0.0
1977 8445 0.0 0.0 0.0
1978 8572 0.0 0.0 0.0
1979 8210 0.0 0.0 0.0
1980 8543 0.0 0.0 0.0
1981 6299 0.0 0.0 0.0
1982 8131 0.0 0.0 0.0
1983 8644 0.0 0.0 0.0
1984 8503 0.0 0.0 0.0
1985 7702 0.0 0.0 0.0
1986 7836 0.0 0.0 0.0
1987 4084 0.0 0.0 0.0
1988 48 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0

For data sources see[5]

References