X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0885081702000

Well Details

Well ID: 0885081702000
Loading map...
Location: 00/02-17-088-08W5/0
Location Alias: 00/02-17-88-08 W5M
Location Alias 2: 00/02-17-088-08 W5/00
Country: Canada
Province: Alberta
Township: 088
Meridian: 5
Range: 08
Section: 17
County/Municipality: Municipal District of Opportunity No. 17
Well Name: MBOG REDEARTH 2-17-88-8
Operator Name: Surge Energy Inc.
License Number: 0044277
License Date: 1972-11-22
License Status: Suspension
Spud Date: 1972-12-08
Final Drill Date: 1973-01-01
Well Total Depth: 1453.90 m
Surface Hole Latitude: 56.626842
Surface Hole Longitude: -115.234222

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-11-22 Obtained License
1973-01-01 Finished Drilling
1973-01-01 Well Mode changed to Drilled and Cased
1973-01-02 Drill Stem Test Performed
1973-01-03 Liner Casing Operation Performed
1973-01-10 Perforation Treatment Performed - Jet Perforation
1973-01-13 Well Began Production
1973-01-13 Well Fluid changed to Crude Oil
1973-01-13 Well Mode changed to Flowing
1973-02-01 Well Fluid changed to Crude Oil
1973-02-01 Well Mode changed to Pumping
1975-12-10 Perforation Treatment Performed - Jet Perforation
1976-01-13 Perforation Treatment Performed - Jet Perforation
1976-01-14 Well Fluid changed to Crude Oil
1976-01-14 Well Mode changed to Suspended
1976-09-13 Perforation Treatment Performed - Acid Wash - No Pressure
1976-09-14 Perforation Treatment Performed - Fractured
1997-08-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-08-21 Plug Back Performed
1997-08-21 Well Fluid changed to Crude Oil
1997-08-21 Well Log Performed
1997-08-21 Well Mode changed to Abandoned Zone
1998-01-28 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-01-10 Perforation 1429.80 1434.40 7
1973-01-10 Perforation 1436.20 1439.90 7
1975-12-10 Perforation 1295.10 1296.90 13
1976-01-13 Perforation 1278.90 1282.30 13
1976-09-13 Acid Wash 1278.90 1296.90 0
1976-09-14 Fracture 1278.90 1296.90 0
1997-08-21 Packing Device Capped w/Cement 1263.00 1271.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1973 6189 0.0 0.0 0.0
1974 7545 0.0 0.0 0.0
1975 8630 0.0 0.0 0.0

For data sources see[5]

References