X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0885081013000

Well Details

Well ID: 0885081013000
Loading map...
Location: 00/13-10-088-08W5/0
Location Alias: 00/13-10-88-08 W5M
Location Alias 2: 00/13-10-088-08 W5/00
Country: Canada
Province: Alberta
Township: 088
Meridian: 5
Range: 08
Section: 10
County/Municipality: Municipal District of Opportunity No. 17
Well Name: PPR REDEARTH 13-10-88-8
Operator Name: Prairie Provident Resources Canada Ltd.
License Number: 0442705
License Date: 2012-01-11
License Status: Issued
Spud Date: 2012-02-18
Final Drill Date: 2012-03-02
Well Total Depth: 2875.00 m
Surface Hole Latitude: 56.608902
Surface Hole Longitude: -115.194187

For data sources see[1][2]

Well History

Date Event
2012-01-11 Obtained License
2012-02-19 Surface Casing Operation Performed
2012-02-22 Direction Drilling Operation Performed - Horizontal
2012-03-02 Finished Drilling
2012-03-02 Well Mode changed to Drilled and Cased
2012-03-03 Production Casing Operation Performed
2012-03-04 Rig Released
2012-03-08 Well Log Performed
2012-03-12 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-13 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-14 Perforation Treatment Performed - Multi-Stage Fracture
2012-04-08 Well Began Production
2012-04-08 Well Fluid changed to Crude Oil
2012-04-08 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-02-18 Precision Drilling Corporation 104 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-22 1064.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-03-12 Multi-Stage Fracture 2863.00 2863.10 0
2012-03-13 Multi-Stage Fracture 2387.30 2387.40 0
2012-03-13 Multi-Stage Fracture 2328.10 2328.20 0
2012-03-13 Multi-Stage Fracture 2282.20 2282.30 0
2012-03-13 Multi-Stage Fracture 2110.20 2110.30 0
2012-03-14 Multi-Stage Fracture 2015.00 2015.10 0
2012-03-14 Multi-Stage Fracture 1925.80 1925.90 0
2012-03-14 Multi-Stage Fracture 1879.60 1879.70 0
2012-03-14 Multi-Stage Fracture 1820.20 1820.30 0
2012-03-14 Multi-Stage Fracture 1761.00 1761.10 0
2012-03-14 Multi-Stage Fracture 1662.00 1662.10 0
2012-03-12 Multi-Stage Fracture 2808.90 2809.00 0
2012-03-14 Multi-Stage Fracture 1563.00 1563.10 0
2012-03-14 Multi-Stage Fracture 1503.60 1503.70 0
2012-03-12 Multi-Stage Fracture 2749.40 2749.50 0
2012-03-12 Multi-Stage Fracture 2703.30 2703.40 0
2012-03-12 Multi-Stage Fracture 2643.80 2643.90 0
2012-03-12 Multi-Stage Fracture 2597.60 2597.70 0
2012-03-12 Multi-Stage Fracture 2538.40 2538.50 0
2012-03-13 Multi-Stage Fracture 2492.30 2492.40 0
2012-03-13 Multi-Stage Fracture 2433.40 2433.50 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 5783 0.0 0.0 0.0
2013 8121 0.0 0.0 0.0
2014 8735 0.0 0.0 0.0
2015 7575 0.0 0.0 0.0
2016 8136 0.0 0.0 0.0
2017 7516 0.0 0.0 0.0
2018 8522 0.0 0.0 0.0
2019 8109 0.0 0.0 0.0
2020 1814 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-23 No Incident Encountered 0.00 0.00

For data sources see[8]

References