X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0885073012003

Well Details

Well ID: 0885073012003
Loading map...
Location: 00/12-30-088-07W5/3
Location Alias: 00/12-30-88-07 W5M
Location Alias 2: 00/12-30-088-07 W5/03
Country: Canada
Province: Alberta
Township: 088
Meridian: 5
Range: 07
Section: 30
County/Municipality: Municipal District of Opportunity No. 17
Well Name: MBOG REDEARTH 12-30-88-7
Operator Name: Surge Energy Inc.
License Number: 0135942
License Date: 1988-08-29
License Status: Abandoned
Spud Date: 1988-09-02
Final Drill Date: 1988-10-10
Well Total Depth: 1522.00 m
Surface Hole Latitude: 56.663238
Surface Hole Longitude: -115.111692

For data sources see[1][2]

Well History

Date Event
1988-08-29 Obtained License
1988-09-03 Surface Casing Operation Performed
1988-09-09 Intermediate Casing Operation Performed
1988-10-02 Direction Drilling Operation Performed - Deviate
1988-10-10 Finished Drilling
1988-10-10 Well Log Performed
1988-10-10 Well Mode changed to Drilled and Cased
1988-10-11 Drill Stem Test Performed
1988-10-11 Well Log Performed
1988-10-12 Liner Casing Operation Performed
1988-10-12 Rig Released
1988-10-20 Well Log Performed
1988-10-26 Well Log Performed
1988-10-27 Well Began Production
1988-10-27 Well Fluid changed to Crude Oil
1988-10-27 Well Mode changed to Pumping
1988-10-28 Well Log Performed
1988-10-29 Perforation Treatment Performed - Jet Perforation
1991-02-13 Well Fluid changed to Crude Oil
1991-02-13 Well Mode changed to Suspended
2008-03-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-12 Perforation Treatment Performed - Cement Plug
2008-03-12 Plug Back Performed
2008-03-12 Well Fluid changed to Crude Oil
2008-03-12 Well Mode changed to Abandoned Zone
2008-03-14 Perforation Treatment Performed - Abrasa-Jet Perforation
2008-03-15 Perforation Treatment Performed - Remedial Casing
2008-03-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-18 Well Abandoned
2008-03-18 Well Fluid changed to Crude Oil
2008-03-18 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1988-10-02 1153.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-10-29 Perforation 1502.00 1504.40 13
2008-03-12 Packing Device Capped w/Cement 1220.00 1493.00 0
2008-03-12 Cement Plug 984.90 1220.00 0
2008-03-14 Hydra Jet Perforation 468.50 471.50 1
2008-03-15 Remedial Casing Cementing 468.50 471.50 0
2008-03-16 Packing Device Capped w/Cement 453.00 465.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 1440 0.0 0.0 0.0
1989 8652 0.0 0.0 0.0
1990 8676 0.0 0.0 0.0
1991 750 0.0 0.0 0.0

For data sources see[6]

References