If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0875120615002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.524628,"lon":-115.909202,"icon":""}]} |
Location: 00/15-06-087-12W5/2 | |
Location Alias: 00/15-06-87-12 W5M | |
Location Alias 2: 00/15-06-087-12 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 087 | |
Meridian: 5 | |
Range: 12 | |
Section: 06 | |
County/Municipality: Northern Sunrise County | |
Well Name: ARS ET AL EVI 15-6-87-12 | |
Operator Name: Prairie Provident Resources Canada Ltd. | |
License Number: 0415127 | |
License Date: 2009-12-03 | |
License Status: Suspension | |
Spud Date: 2009-12-10 | |
Final Drill Date: 2009-12-17 | |
Well Total Depth: 1779.00 m | |
Surface Hole Latitude: 56.524628 | |
Surface Hole Longitude: -115.909202 |
Date | Event |
---|---|
2009-11-18 | Well Log Performed |
2009-12-03 | Obtained License |
2009-12-11 | Surface Casing Operation Performed |
2009-12-12 | Direction Drilling Operation Performed - Deviate |
2009-12-17 | Finished Drilling |
2009-12-17 | Well Mode changed to Drilled and Cased |
2009-12-18 | Well Log Performed |
2009-12-19 | Production Casing Operation Performed |
2009-12-19 | Rig Released |
2010-01-13 | Perforation Treatment Performed - Jet Perforation |
2010-03-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-03-12 | Perforation Treatment Performed - Jet Perforation |
2010-03-12 | Plug Back Performed |
2010-03-26 | Well Began Production |
2010-03-26 | Well Fluid changed to Crude Oil |
2010-03-26 | Well Mode changed to Pumping |
2014-05-31 | Well Fluid changed to Crude Oil |
2014-05-31 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2009-12-12 | 371.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-01-13 | Perforation | 1747.00 | 1750.00 | 17 |
2010-03-12 | Packing Device Capped w/Cement | 1735.00 | 1743.00 | 0 |
2010-03-12 | Perforation | 1706.50 | 1709.50 | 17 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 6156 | 0.0 | 0.0 | 0.0 |
2011 | 8630 | 0.0 | 0.0 | 0.0 |
2012 | 1229 | 0.0 | 0.0 | 0.0 |
2013 | 96 | 0.0 | 0.0 | 0.0 |
For data sources see[6]