X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0875112013W00

Well Details

Well ID: 0875112013W00
Loading map...
Location: W0/13-20-087-11W5/0
Location Alias: W0/13-20-87-11 W5M
Location Alias 2: W0/13-20-087-11 W5/00
Country: Canada
Province: Alberta
Township: 087
Meridian: 5
Range: 11
Section: 20
County/Municipality: Northern Sunrise County
Well Name: LONE PINE FOREST EVI 13-20-87-11
Operator Name: Prairie Provident Resources Canada Ltd.
License Number: 0413712
License Date: 2009-11-05
License Status: Amended
Spud Date: 2009-12-31
Final Drill Date: 2010-01-09
Well Total Depth: 2104.00 m
Surface Hole Latitude: 56.559384
Surface Hole Longitude: -115.728966

For data sources see[1][2]

Well History

Date Event
2009-11-05 Obtained License
2010-01-01 Surface Casing Operation Performed
2010-01-03 Well Log Performed
2010-01-04 Direction Drilling Operation Performed - Horizontal
2010-01-06 Well Log Performed
2010-01-09 Finished Drilling
2010-01-09 Well Log Performed
2010-01-09 Well Mode changed to Drilled and Cased
2010-01-11 Production Casing Operation Performed
2010-01-11 Rig Released
2010-01-24 Well Log Performed
2010-02-03 Perforation Treatment Performed - Fractured
2010-02-03 Perforation Treatment Performed - Jet Perforation
2010-02-04 Perforation Treatment Performed - Fractured
2010-02-04 Perforation Treatment Performed - Jet Perforation
2010-03-01 Well Began Production
2010-03-01 Well Fluid changed to Crude Oil
2010-03-01 Well Mode changed to Pumping
2016-03-01 Well Began Injection
2016-03-01 Well Fluid changed to Water
2016-03-01 Well Type changed to Injection
2016-03-05 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-01-04 1288.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-02-03 Perforation 2048.00 2048.10 2
2010-02-04 Fracture 1642.00 1642.10 0
2010-02-04 Perforation 1566.00 1566.10 2
2010-02-04 Fracture 1566.00 1566.10 0
2010-02-03 Fracture 2048.00 2048.10 0
2010-02-03 Perforation 1952.00 1952.10 2
2010-02-03 Fracture 1952.00 1952.10 0
2010-02-03 Perforation 1855.00 1855.10 2
2010-02-03 Fracture 1855.00 1855.10 0
2010-02-03 Perforation 1775.00 1775.10 2
2010-02-03 Fracture 1775.00 1775.10 0
2010-02-04 Perforation 1642.00 1642.10 2

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 6666 0.0 0.0 0.0
2011 8407 0.0 0.0 0.0
2012 8724 0.0 0.0 0.0
2013 7776 0.0 0.0 0.0
2014 7758 0.0 0.0 0.0
2015 8723 0.0 0.0 0.0
2016 1412 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-03-06 No Incident Encountered 0.00 0.00

For data sources see[7]

References