X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0875111514020

Well Details

Well ID: 0875111514020
Loading map...
Location: 02/14-15-087-11W5/0
Location Alias: 02/14-15-87-11 W5M
Location Alias 2: 02/14-15-087-11 W5/00
Country: Canada
Province: Alberta
Township: 087
Meridian: 5
Range: 11
Section: 15
County/Municipality: Northern Sunrise County
Well Name: CDN FOREST EVI 14-15-87-11
Operator Name: Prairie Provident Resources Canada Ltd.
License Number: 0434693
License Date: 2011-06-28
License Status: Issued
Spud Date: 2011-07-18
Final Drill Date: 2011-07-24
Well Total Depth: 2007.00 m
Surface Hole Latitude: 56.545323
Surface Hole Longitude: -115.666297

For data sources see[1][2]

Well History

Date Event
2011-06-28 Obtained License
2011-07-19 Surface Casing Operation Performed
2011-07-21 Direction Drilling Operation Performed - Deviate
2011-07-22 Direction Drilling Operation Performed - Horizontal
2011-07-24 Finished Drilling
2011-07-24 Well Log Performed
2011-07-24 Well Mode changed to Drilled and Cased
2011-07-25 Well Log Performed
2011-07-26 Perforation Treatment Performed - Multi-Stage Fracture
2011-07-26 Production Casing Operation Performed
2011-07-26 Rig Released
2011-08-09 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-08-09 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-23 Well Began Production
2011-10-23 Well Fluid changed to Crude Oil
2011-10-23 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-07-21 1240.00 Deviate (5 - 79 degrees)
2011-07-22 1556.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-07-26 Multi-Stage Fracture 1548.30 1548.40 0
2011-08-09 Multi-Stage Fracture 1533.10 1533.60 0
2011-08-09 Multi-Stage Fracture 1590.50 1591.00 0
2011-08-09 Multi-Stage Fracture 1646.90 1647.40 0
2011-08-09 Multi-Stage Fracture 1704.10 1704.60 0
2011-08-09 Multi-Stage Fracture 1761.30 1761.80 0
2011-08-09 Multi-Stage Fracture 1818.10 1818.60 0
2011-08-09 Multi-Stage Fracture 1874.90 1875.40 0
2011-08-09 Multi-Stage Fracture 1931.70 1932.20 0
2011-07-26 Multi-Stage Fracture 1587.80 1587.90 0
2011-07-26 Multi-Stage Fracture 1645.20 1645.30 0
2011-07-26 Multi-Stage Fracture 1700.40 1700.50 0
2011-07-26 Multi-Stage Fracture 1757.50 1757.60 0
2011-07-26 Multi-Stage Fracture 1814.70 1814.80 0
2011-07-26 Multi-Stage Fracture 1872.30 1872.40 0
2011-07-26 Multi-Stage Fracture 1929.90 1930.00 0
2011-08-09 Hydra Jet Perforation 1970.50 1970.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1627 0.0 0.0 0.0
2012 7372 0.0 0.0 0.0
2013 8462 0.0 0.0 0.0
2014 8726 0.0 0.0 0.0
2015 8726 0.0 0.0 0.0
2016 8737 0.0 0.0 0.0
2017 8169 0.0 0.0 0.0
2018 8478 0.0 0.0 0.0
2019 7359 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References