X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0875110107000

Well Details

Well ID: 0875110107000
Loading map...
Location: 00/07-01-087-11W5/0
Location Alias: 00/07-01-87-11 W5M
Location Alias 2: 00/07-01-087-11 W5/00
Country: Canada
Province: Alberta
Township: 087
Meridian: 5
Range: 11
Section: 01
County/Municipality: Northern Sunrise County
Well Name: MBOG EVI 7-1-87-11
Operator Name: Surge Energy Inc.
License Number: 0121917
License Date: 1986-01-29
License Status: Amended
Spud Date: 1986-02-01
Final Drill Date: 1986-02-13
Well Total Depth: 1533.70 m
Surface Hole Latitude: 56.512586
Surface Hole Longitude: -115.606552

For data sources see[1][2]

Well History

Date Event
1986-01-29 Obtained License
1986-02-02 Surface Casing Operation Performed
1986-02-13 Finished Drilling
1986-02-13 Well Mode changed to Drilled and Cased
1986-02-14 Well Log Performed
1986-02-16 Production Casing Operation Performed
1986-02-16 Rig Released
1986-02-21 Well Log Performed
1986-02-22 Perforation Treatment Performed - Jet Perforation
1986-03-02 Well Began Production
1986-03-02 Well Fluid changed to Crude Oil
1986-03-02 Well Mode changed to Flowing
1987-12-01 Perforation Treatment Performed - Cement Squeeze
1992-07-11 Well Log Performed
1992-07-12 Perforation Treatment Performed - Jet Perforation
1992-07-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-07-24 Well Log Performed
1992-07-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-07-25 Perforation Treatment Performed - Jet Perforation
1992-07-25 Plug Back Performed
1992-07-25 Well Fluid changed to Crude Oil
1992-07-25 Well Log Performed
1992-07-25 Well Mode changed to Abandoned Zone
1992-07-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-06-15 Perforation Treatment Performed - Jet Perforation
1995-06-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-06-16 Perforation Treatment Performed - Cement Squeeze
1995-06-17 Perforation Treatment Performed - Cement Squeeze
1995-06-17 Plug Back Performed
1995-06-21 Well Log Performed
1995-06-22 Well Log Performed
1995-06-23 Perforation Treatment Performed - Jet Perforation
1995-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-07-01 Well Began Injection
1995-07-01 Well Fluid changed to Water
1995-07-01 Well Type changed to Disposal
2006-06-11 Well Log Performed
2006-06-12 Well Log Performed
2006-06-13 Well Log Performed
2009-03-23 Perforation Treatment Performed - Jet Perforation
2009-03-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-06-13 Well Log Performed
2011-06-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-06-14 Plug Back Performed
2011-06-14 Well Fluid changed to Water
2011-06-14 Well Log Performed
2011-06-14 Well Mode changed to Abandoned Zone
2011-06-14 Well Type changed to Disposal
2011-06-15 Well Log Performed
2011-06-16 Perforation Treatment Performed - Jet Perforation
2011-06-16 Well Log Performed
2011-06-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-06-19 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-02-22 Perforation 1490.00 1502.00 13
1995-06-15 Perforation 1486.00 1488.50 13
1995-06-16 Cement Squeeze 1486.00 1488.00 0
1995-06-16 Acid Treatment 912.00 915.50 0
1995-06-17 Cement Squeeze 912.00 915.50 0
1995-06-23 Perforation 1490.00 1502.00 20
1995-06-23 Perforation 1506.00 1508.00 20
1995-06-23 Perforation 1509.50 1513.00 20
1995-06-25 Acid Treatment 1490.00 1513.00 0
2009-03-23 Perforation 1496.00 1502.00 20
2009-03-26 Acid Treatment 1496.00 1513.00 0
1986-02-22 Perforation 1506.00 1508.00 13
2011-06-14 Packing Device Capped w/Cement 1472.90 1480.90 0
2011-06-16 Perforation 728.00 735.00 17
2011-06-16 Perforation 707.00 714.00 17
2011-06-18 Acid Treatment 707.00 735.00 0
1986-02-22 Perforation 1509.50 1513.00 13
1987-12-01 Cement Squeeze 1506.00 1513.00 0
1992-07-12 Perforation 1486.00 1488.50 13
1992-07-13 Acid Treatment 1486.00 1488.50 0
1992-07-25 Packing Device Capped w/Cement 1467.00 1475.00 0
1992-07-25 Perforation 912.00 915.50 13
1992-07-28 Acid Treatment 912.00 915.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 6134 0.0 0.0 0.0
1987 7217 0.0 0.0 0.0
1988 6102 0.0 0.0 0.0
1989 8719 0.0 0.0 0.0
1990 6357 0.0 0.0 0.0
1991 151 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0

For data sources see[5]

References