X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0875093503020

Well Details

Well ID: 0875093503020
Loading map...
Location: 02/03-35-087-09W5/0
Location Alias: 02/03-35-87-09 W5M
Location Alias 2: 02/03-35-087-09 W5/00
Country: Canada
Province: Alberta
Township: 087
Meridian: 5
Range: 09
Section: 35
County/Municipality: Loon Lake 235
Well Name: MBOG REDEARTH 3-35-87-9
Operator Name: Surge Energy Inc.
License Number: 0121432
License Date: 1986-01-15
License Status: Issued
Spud Date: 1986-01-05
Final Drill Date: 1986-01-22
Well Total Depth: 1465.00 m
Surface Hole Latitude: 56.582900
Surface Hole Longitude: -115.318409

For data sources see[1][2]

Well History

Date Event
1986-01-08 Surface Casing Operation Performed
1986-01-10 Lost Circulation Occurred
1986-01-15 Intermediate Casing Operation Performed
1986-01-15 Obtained License
1986-01-22 Finished Drilling
1986-01-22 Well Log Performed
1986-01-22 Well Mode changed to Drilled and Cased
1986-01-24 Liner Casing Operation Performed
1986-01-25 Rig Released
1986-02-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-02-07 Perforation Treatment Performed - Jet Perforation
1986-02-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-02-24 Perforation Treatment Performed - Jet Perforation
1986-02-24 Plug Back Performed
1986-02-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-03-01 Well Began Production
1986-03-01 Well Fluid changed to Crude Oil
1986-03-01 Well Mode changed to Pumping
1986-03-22 Perforation Treatment Performed - Fractured
2009-02-26 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-02-07 Perforation 1427.50 1430.00 13
1986-02-07 Acid Treatment 1427.50 1430.00 0
1986-02-24 Packing Device Capped w/Cement 1342.00 1350.00 0
1986-02-24 Perforation 1280.00 1284.00 13
1986-02-24 Perforation 1284.40 1287.00 13
1986-02-25 Acid Treatment 1280.00 1287.00 0
1986-03-22 Fracture 1280.00 1287.00 0
2009-02-26 Perforation 1298.50 1300.00 13
2009-02-26 Perforation 1304.00 1307.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 6133 0.0 0.0 0.0
1987 8548 0.0 0.0 0.0
1988 6799 0.0 0.0 0.0
1989 7764 0.0 0.0 0.0
1990 8616 0.0 0.0 0.0
1991 8364 0.0 0.0 0.0
1992 8242 0.0 0.0 0.0
1993 8548 0.0 0.0 0.0
1994 8389 0.0 0.0 0.0
1995 8701 0.0 0.0 0.0
1996 8528 0.0 0.0 0.0
1997 8623 0.0 0.0 0.0
1998 8363 0.0 0.0 0.0
1999 8577 0.0 0.0 0.0
2000 8610 0.0 0.0 0.0
2001 8176 0.0 0.0 0.0
2002 7079 0.0 0.0 0.0
2003 5940 0.0 0.0 0.0
2004 5603 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8507 0.0 0.0 0.0
2007 8519 0.0 0.0 0.0
2008 5453 0.0 0.0 0.0
2009 5185 0.0 0.0 0.0
2010 7933 0.0 0.0 0.0
2011 8106 0.0 0.0 0.0
2012 8687 0.0 0.0 0.0
2013 8081 0.0 0.0 0.0
2014 8447 0.0 0.0 0.0
2015 8750 0.0 0.0 0.0
2016 7407 0.0 0.0 0.0
2017 8615 0.0 0.0 0.0
2018 8740 0.0 0.0 0.0
2019 8138 0.0 0.0 0.0
2020 2111 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1986-01-10 Lost Circulation 439.00 439.00

For data sources see[6]

References