X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0875083313000

Well Details

Well ID: 0875083313000
Loading map...
Location: 00/13-33-087-08W5/0
Location Alias: 00/13-33-87-08 W5M
Location Alias 2: 00/13-33-087-08 W5/00
Country: Canada
Province: Alberta
Township: 087
Meridian: 5
Range: 08
Section: 33
County/Municipality: Municipal District of Opportunity No. 17
Well Name: PPR REDEARTH 13-33-87-8
Operator Name: Prairie Provident Resources Canada Ltd.
License Number: 0436746
License Date: 2011-09-13
License Status: Issued
Spud Date: 2011-10-23
Final Drill Date: 2011-11-04
Well Total Depth: 2904.00 m
Surface Hole Latitude: 56.578853
Surface Hole Longitude: -115.219761

For data sources see[1][2]

Well History

Date Event
2011-09-13 Obtained License
2011-10-25 Surface Casing Operation Performed
2011-10-28 Direction Drilling Operation Performed - Horizontal
2011-11-04 Finished Drilling
2011-11-04 Well Log Performed
2011-11-04 Well Mode changed to Drilled and Cased
2011-11-06 Production Casing Operation Performed
2011-11-07 Rig Released
2011-11-10 Well Log Performed
2011-11-15 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-16 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-17 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-18 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-19 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-05 Well Began Production
2011-12-05 Well Fluid changed to Crude Oil
2011-12-05 Well Mode changed to Pumping
2014-11-14 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-10-28 1022.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-11-15 Multi-Stage Fracture 2880.30 2880.40 0
2011-11-17 Multi-Stage Fracture 2371.80 2371.90 0
2011-11-17 Multi-Stage Fracture 2311.90 2312.00 0
2011-11-17 Multi-Stage Fracture 2262.20 2262.30 0
2011-11-18 Multi-Stage Fracture 2202.10 2202.20 0
2011-11-18 Multi-Stage Fracture 2142.00 2142.10 0
2011-11-19 Multi-Stage Fracture 2091.30 2091.40 0
2011-11-19 Multi-Stage Fracture 2031.30 2031.40 0
2011-11-19 Multi-Stage Fracture 1971.30 1971.40 0
2011-11-19 Multi-Stage Fracture 1921.80 1921.90 0
2011-11-19 Multi-Stage Fracture 1861.80 1861.90 0
2011-11-15 Multi-Stage Fracture 2831.10 2831.20 0
2011-11-19 Multi-Stage Fracture 1801.90 1802.00 0
2011-11-19 Multi-Stage Fracture 1741.90 1742.00 0
2011-11-19 Multi-Stage Fracture 1692.40 1692.50 0
2011-11-19 Multi-Stage Fracture 1632.40 1632.50 0
2011-11-19 Multi-Stage Fracture 1572.70 1572.80 0
2011-11-16 Multi-Stage Fracture 2773.10 2773.20 0
2011-11-16 Multi-Stage Fracture 2712.50 2712.60 0
2011-11-17 Multi-Stage Fracture 2658.30 2658.40 0
2011-11-17 Multi-Stage Fracture 2600.10 2600.20 0
2011-11-17 Multi-Stage Fracture 2544.90 2545.00 0
2011-11-17 Multi-Stage Fracture 2488.50 2488.60 0
2011-11-17 Multi-Stage Fracture 2431.90 2432.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 643 0.0 0.0 0.0
2012 8176 0.0 0.0 0.0
2013 7561 0.0 0.0 0.0
2014 8603 0.0 0.0 0.0
2015 8472 0.0 0.0 0.0
2016 8393 0.0 0.0 0.0
2017 8575 0.0 0.0 0.0
2018 8703 0.0 0.0 0.0
2019 8591 0.0 0.0 0.0
2020 1973 0.0 0.0 0.0

For data sources see[6]

References