X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0875082812000

Well Details

Well ID: 0875082812000
Loading map...
Location: 00/12-28-087-08W5/0
Location Alias: 00/12-28-87-08 W5M
Location Alias 2: 00/12-28-087-08 W5/00
Country: Canada
Province: Alberta
Township: 087
Meridian: 5
Range: 08
Section: 28
County/Municipality: Municipal District of Opportunity No. 17
Well Name: MBOG REDEARTH 12-28-87-8
Operator Name: Surge Energy Inc.
License Number: 0025797
License Date: 1964-02-28
License Status: Suspension
Spud Date: 1965-10-25
Final Drill Date: 1965-11-12
Well Total Depth: 1475.80 m
Surface Hole Latitude: 56.575595
Surface Hole Longitude: -115.221377

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-02-28 Obtained License
1965-11-05 Drill Stem Test Performed
1965-11-12 Finished Drilling
1965-11-12 Well Mode changed to Drilled and Cased
1965-11-13 Production Casing Operation Performed
1965-11-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-11-16 Perforation Treatment Performed - Bullet Perforation
1965-11-18 Perforation Treatment Performed - Fractured
1965-11-22 Perforation Treatment Performed - Bullet Perforation
1965-12-05 Well Began Production
1965-12-05 Well Fluid changed to Crude Oil
1965-12-05 Well Mode changed to Flowing
1966-01-27 Perforation Treatment Performed - Selective Bullet Perforations
1966-02-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-02-01 Perforation Treatment Performed - Cement Squeeze
1966-02-03 Perforation Treatment Performed - Bullet Perforation
1966-02-04 Perforation Treatment Performed - Bullet Perforation
1966-02-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-02-06 Perforation Treatment Performed - Bullet Perforation
1966-02-08 Perforation Treatment Performed - Cement Squeeze
1966-02-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1966-02-10 Perforation Treatment Performed - Bullet Perforation
1966-02-15 Well Fluid changed to Crude Oil
1966-02-15 Well Mode changed to Pumping
1969-09-25 Well Fluid changed to Crude Oil
1969-09-25 Well Mode changed to Suspended
1969-11-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1969-11-03 Well Fluid changed to Crude Oil
1969-11-03 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-11-16 Bullet Perforation 1324.70 1325.60 13
1966-02-04 Bullet Perforation 1467.60 1468.20 13
1966-02-05 Acid Treatment 1467.60 1468.20 0
1966-02-06 Bullet Perforation 1463.60 1464.60 13
1966-02-06 Bullet Perforation 1468.50 1469.10 13
1966-02-08 Cement Squeeze 1463.60 1469.10 0
1966-02-10 Packing Device Capped w/Cement 1460.90 1460.90 0
1966-02-10 Bullet Perforation 1458.20 1459.10 10
1969-11-03 Packing Device Capped w/Cement 1432.60 1432.60 0
1965-11-16 Bullet Perforation 1325.90 1328.90 26
1965-11-16 Acid Treatment 1324.70 1328.90 0
1965-11-18 Fracture 1324.70 1328.90 0
1965-11-22 Bullet Perforation 1463.60 1464.60 13
1966-01-27 Selective Bullet Perforations 1471.00 1471.00 0
1966-02-01 Acid Treatment 1471.00 1471.00 0
1966-02-01 Cement Squeeze 1463.60 1464.60 0
1966-02-03 Bullet Perforation 1464.00 1464.60 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 384 0.0 0.0 0.0
1968 1452 0.0 0.0 0.0

For data sources see[5]

References