X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0875082204020

Well Details

Well ID: 0875082204020
Loading map...
Location: 02/04-22-087-08W5/0
Location Alias: 02/04-22-87-08 W5M
Location Alias 2: 02/04-22-087-08 W5/00
Country: Canada
Province: Alberta
Township: 087
Meridian: 5
Range: 08
Section: 22
County/Municipality: Municipal District of Opportunity No. 17
Well Name: MBOG REDEARTH 4-22-87-8
Operator Name: Surge Energy Inc.
License Number: 0431989
License Date: 2011-03-01
License Status: Amended
Spud Date: 2011-07-06
Final Drill Date: 2011-07-28
Well Total Depth: 2833.00 m
Surface Hole Latitude: 56.567017
Surface Hole Longitude: -115.194234

For data sources see[1][2]

Well History

Date Event
2011-03-01 Obtained License
2011-07-10 Surface Casing Operation Performed
2011-07-13 Lost Circulation Occurred
2011-07-15 Intermediate Casing Operation Performed
2011-07-16 Direction Drilling Operation Performed - Horizontal
2011-07-16 Well Log Performed
2011-07-18 Well Log Performed
2011-07-19 Intermediate Casing Operation Performed
2011-07-20 Well Log Performed
2011-07-28 Finished Drilling
2011-07-28 Well Log Performed
2011-07-28 Well Structure changed to Drain
2011-07-29 Liner Casing Operation Performed
2011-08-06 Well Log Performed
2011-08-07 Well Log Performed
2011-08-10 Rig Released
2011-09-12 Well Log Performed
2011-09-28 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-28 Perforation Treatment Performed - Open-Hole Completion
2011-09-29 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-30 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-07-16 1099.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-09-28 Open Hole/Barefoot Completion 2823.00 2833.00 0
2011-09-30 Multi-Stage Fracture 2210.90 2211.30 0
2011-09-30 Multi-Stage Fracture 2136.70 2137.10 0
2011-09-30 Multi-Stage Fracture 2062.70 2063.10 0
2011-09-30 Multi-Stage Fracture 1988.60 1989.00 0
2011-09-30 Multi-Stage Fracture 1914.50 1914.90 0
2011-09-30 Multi-Stage Fracture 1840.50 1840.90 0
2011-09-30 Multi-Stage Fracture 1766.30 1766.70 0
2011-09-30 Multi-Stage Fracture 1692.20 1692.60 0
2011-09-28 Multi-Stage Fracture 2792.50 2792.90 0
2011-09-28 Multi-Stage Fracture 2729.50 2729.80 0
2011-09-28 Multi-Stage Fracture 2688.00 2688.40 0
2011-09-29 Multi-Stage Fracture 2581.30 2581.70 0
2011-09-30 Multi-Stage Fracture 2507.20 2507.60 0
2011-09-30 Multi-Stage Fracture 2433.00 2433.40 0
2011-09-30 Multi-Stage Fracture 2358.90 2359.30 0
2011-09-30 Multi-Stage Fracture 2284.90 2285.30 0

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-07-13 Lost Circulation 742.00 1051.00

For data sources see[6]

References