If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0866132201000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.467382,"lon":-119.978517,"icon":""}]} |
Location: 00/01-22-086-13W6/0 | |
Location Alias: 00/01-22-86-13 W6M | |
Location Alias 2: 00/01-22-086-13 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 086 | |
Meridian: 6 | |
Range: 13 | |
Section: 22 | |
County/Municipality: Clear Hills County | |
Well Name: EEL BDYLKS 1-22-86-13 | |
Operator Name: Enercapita Energy Ltd. | |
License Number: 0442259 | |
License Date: 2012-01-04 | |
License Status: Amended | |
Spud Date: 2012-01-19 | |
Final Drill Date: 2012-02-06 | |
Well Total Depth: 2700.00 m | |
Surface Hole Latitude: 56.467382 | |
Surface Hole Longitude: -119.978517 |
Date | Event |
---|---|
2012-01-04 | Obtained License |
2012-01-20 | Surface Casing Operation Performed |
2012-01-23 | Direction Drilling Operation Performed - Horizontal |
2012-01-29 | Intermediate Casing Operation Performed |
2012-02-06 | Finished Drilling |
2012-02-06 | Well Log Performed |
2012-02-06 | Well Mode changed to Drilled and Cased |
2012-02-08 | Liner Casing Operation Performed |
2012-02-08 | Production Casing Operation Performed |
2012-02-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-15 | Perforation Treatment Performed - Open-Hole Completion |
2012-02-25 | Rig Released |
2012-03-05 | Well Began Production |
2012-03-05 | Well Fluid changed to Crude Oil |
2012-03-05 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2012-01-23 | 1165.50 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-02-15 | Multi-Stage Fracture | 2672.80 | 2672.90 | 0 |
2012-02-15 | Multi-Stage Fracture | 1955.20 | 1955.30 | 0 |
2012-02-15 | Multi-Stage Fracture | 1872.60 | 1872.70 | 0 |
2012-02-15 | Multi-Stage Fracture | 1789.50 | 1789.60 | 0 |
2012-02-15 | Multi-Stage Fracture | 1707.00 | 1707.10 | 0 |
2012-02-15 | Multi-Stage Fracture | 1624.10 | 1624.20 | 0 |
2012-02-15 | Multi-Stage Fracture | 1541.20 | 1541.30 | 0 |
2012-02-15 | Open Hole/Barefoot Completion | 2694.50 | 2700.00 | 0 |
2012-02-15 | Multi-Stage Fracture | 2622.60 | 2622.70 | 0 |
2012-02-15 | Multi-Stage Fracture | 2539.00 | 2539.10 | 0 |
2012-02-15 | Multi-Stage Fracture | 2455.50 | 2455.60 | 0 |
2012-02-15 | Multi-Stage Fracture | 2371.90 | 2372.00 | 0 |
2012-02-15 | Multi-Stage Fracture | 2288.60 | 2288.70 | 0 |
2012-02-15 | Multi-Stage Fracture | 2204.80 | 2204.90 | 0 |
2012-02-15 | Multi-Stage Fracture | 2120.80 | 2120.90 | 0 |
2012-02-15 | Multi-Stage Fracture | 2037.40 | 2037.50 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 4775 | 0.0 | 0.0 | 0.0 |
2013 | 8403 | 0.0 | 0.0 | 0.0 |
2014 | 8405 | 0.0 | 0.0 | 0.0 |
2015 | 8537 | 0.0 | 0.0 | 0.0 |
2016 | 4783 | 0.0 | 0.0 | 0.0 |
2017 | 6862 | 0.0 | 0.0 | 0.0 |
2018 | 8424 | 0.0 | 0.0 | 0.0 |
2019 | 8435 | 0.0 | 0.0 | 0.0 |
For data sources see[6]