If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0866082409002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.473797,"lon":-119.117172,"icon":""}]} |
Location: 00/09-24-086-08W6/2 | |
Location Alias: 00/09-24-86-08 W6M | |
Location Alias 2: 00/09-24-086-08 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 086 | |
Meridian: 6 | |
Range: 08 | |
Section: 24 | |
County/Municipality: Clear Hills County | |
Well Name: PW GAS CECIL 9-24-86-8 | |
Operator Name: TAQA North Ltd. | |
License Number: 0210762 | |
License Date: 1997-12-17 | |
License Status: Abandoned | |
Spud Date: 1998-01-07 | |
Final Drill Date: 1998-02-05 | |
Well Total Depth: 2275.00 m | |
Surface Hole Latitude: 56.473797 | |
Surface Hole Longitude: -119.117172 |
Date | Event |
---|---|
1997-12-17 | Obtained License |
1998-01-10 | Surface Casing Operation Performed |
1998-01-25 | Direction Drilling Operation Performed - Deviate |
1998-02-04 | Well Log Performed |
1998-02-05 | Finished Drilling |
1998-02-05 | Well Log Performed |
1998-02-06 | Well Log Performed |
1998-02-07 | Plug Back Performed |
1998-02-07 | Well Log Performed |
1998-02-08 | Production Casing Operation Performed |
1998-02-08 | Rig Released |
1998-04-22 | Well Log Performed |
1998-04-23 | Perforation Treatment Performed - Jet Perforation |
1998-04-24 | Well Log Performed |
1998-04-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-04-25 | Perforation Treatment Performed - Jet Perforation |
1998-04-25 | Plug Back Performed |
1998-04-26 | Well Log Performed |
1998-04-27 | Perforation Treatment Performed - Jet Perforation |
1998-04-28 | Well Abandoned |
1998-04-28 | Well Mode changed to Abandoned |
1998-04-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-04-29 | Plug Back Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1998-01-25 | 1509.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1998-04-23 | Perforation | 1050.00 | 1054.00 | 17 |
1998-04-25 | Packing Device Capped w/Cement | 1035.00 | 1043.00 | 0 |
1998-04-25 | Perforation | 1017.00 | 1019.00 | 18 |
1998-04-27 | Perforation | 1003.50 | 1004.50 | 17 |
1998-04-27 | Perforation | 1006.00 | 1009.00 | 17 |
1998-04-29 | Packing Device Capped w/Cement | 1007.00 | 1015.00 | 0 |
1998-04-29 | Packing Device Capped w/Cement | 990.00 | 998.00 | 0 |
For data sources see[5]