If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0866081605002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.455427,"lon":-119.186193,"icon":""}]} |
Location: 00/05-16-086-08W6/2 | |
Location Alias: 00/05-16-86-08 W6M | |
Location Alias 2: 00/05-16-086-08 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 086 | |
Meridian: 6 | |
Range: 08 | |
Section: 16 | |
County/Municipality: Clear Hills County | |
Well Name: BIRCHCLIFF 5-15HZ CECIL 5-16-86-8 | |
Operator Name: Enercapita Energy Ltd. | |
License Number: 0436451 | |
License Date: 2011-08-30 | |
License Status: Suspension | |
Spud Date: 2011-09-10 | |
Final Drill Date: 2011-09-28 | |
Well Total Depth: 2446.00 m | |
Surface Hole Latitude: 56.455427 | |
Surface Hole Longitude: -119.186193 |
Date | Event |
---|---|
2011-08-30 | Obtained License |
2011-09-11 | Surface Casing Operation Performed |
2011-09-13 | Lost Circulation Occurred |
2011-09-14 | Direction Drilling Operation Performed - Deviate |
2011-09-15 | Direction Drilling Operation Performed - Horizontal |
2011-09-23 | Intermediate Casing Operation Performed |
2011-09-28 | Finished Drilling |
2011-09-28 | Well Mode changed to Drilled and Cased |
2011-09-29 | Rig Released |
2011-10-02 | Perforation Treatment Performed - Open-Hole Completion |
2011-11-11 | Perforation Treatment Performed - Fractured |
2011-12-13 | Liner Casing Operation Performed |
2012-01-05 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-01-05 | Perforation Treatment Performed - Open-Hole Completion |
2012-01-14 | Well Began Production |
2012-01-14 | Well Fluid changed to Crude Oil |
2012-01-14 | Well Mode changed to Pumping |
2012-01-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-09-01 | Well Fluid changed to Crude Oil |
2014-09-01 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-09-14 | 384.90 | Deviate (5 - 79 degrees) |
2011-09-15 | 723.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-10-02 | Open Hole/Barefoot Completion | 1255.00 | 2446.00 | 0 |
2012-01-20 | Multi-Stage Fracture | 1565.60 | 1566.40 | 0 |
2011-11-11 | Fracture | 2374.00 | 2378.60 | 0 |
2012-01-05 | Open Hole/Barefoot Completion | 2255.90 | 2446.00 | 0 |
2012-01-05 | Multi-Stage Fracture | 2209.70 | 2210.50 | 0 |
2012-01-20 | Multi-Stage Fracture | 2130.70 | 2131.50 | 0 |
2012-01-20 | Multi-Stage Fracture | 2052.00 | 2052.80 | 0 |
2012-01-20 | Multi-Stage Fracture | 1972.90 | 1973.70 | 0 |
2012-01-20 | Multi-Stage Fracture | 1894.20 | 1895.00 | 0 |
2012-01-20 | Multi-Stage Fracture | 1815.80 | 1816.60 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 5626 | 0.0 | 0.0 | 0.0 |
2013 | 5553 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2011-09-13 | Lost Circulation | 282.00 | 282.00 |
For data sources see[7]