If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0866080206000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.428577,"lon":-119.150704,"icon":""}]} |
Location: 00/06-02-086-08W6/0 | |
Location Alias: 00/06-02-86-08 W6M | |
Location Alias 2: 00/06-02-086-08 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 086 | |
Meridian: 6 | |
Range: 08 | |
Section: 02 | |
County/Municipality: Clear Hills County | |
Well Name: CNRES CECIL 6-2-86-8 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0231508 | |
License Date: 1999-12-24 | |
License Status: Suspension | |
Spud Date: 2000-03-16 | |
Final Drill Date: 2000-03-22 | |
Well Total Depth: 1310.00 m | |
Surface Hole Latitude: 56.428577 | |
Surface Hole Longitude: -119.150704 |
Date | Event |
---|---|
1999-12-24 | Obtained License |
2000-03-17 | Surface Casing Operation Performed |
2000-03-22 | Finished Drilling |
2000-03-22 | Well Log Performed |
2000-03-23 | Production Casing Operation Performed |
2000-03-23 | Rig Released |
2000-03-23 | Well Mode changed to Drilled and Cased |
2000-03-25 | Well Log Performed |
2000-03-28 | Perforation Treatment Performed - Jet Perforation |
2000-03-28 | Well Log Performed |
2000-04-28 | Well Began Production |
2000-04-28 | Well Fluid changed to Gas |
2000-04-28 | Well Mode changed to Flowing |
2000-09-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-09-30 | Plug Back Performed |
2000-09-30 | Well Fluid changed to Gas |
2000-09-30 | Well Log Performed |
2000-09-30 | Well Mode changed to Abandoned Zone |
2000-10-01 | Perforation Treatment Performed - Jet Perforation |
2000-10-01 | Well Log Performed |
2000-10-02 | Perforation Treatment Performed - Remedial Casing |
2000-10-05 | Perforation Treatment Performed - Jet Perforation |
2000-10-05 | Well Log Performed |
2000-10-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-10-11 | Perforation Treatment Performed - Jet Perforation |
2000-10-11 | Plug Back Performed |
2000-10-11 | Well Log Performed |
2002-02-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-02-10 | Plug Back Performed |
2002-02-10 | Well Log Performed |
2002-02-11 | Perforation Treatment Performed - Jet Perforation |
2002-02-11 | Well Log Performed |
2003-10-01 | Perforation Treatment Performed - Jet Perforation |
2003-10-04 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2000-03-28 | Perforation | 1262.50 | 1263.70 | 17 |
2003-10-01 | Perforation | 899.00 | 900.00 | 17 |
2003-10-01 | Perforation | 880.00 | 881.00 | 17 |
2003-10-04 | Fracture | 899.00 | 900.00 | 0 |
2000-09-30 | Packing Device Capped w/Cement | 1250.00 | 1258.00 | 0 |
2000-10-01 | Perforation | 525.00 | 525.90 | 13 |
2000-10-02 | Remedial Casing Cementing | 525.00 | 525.90 | 0 |
2000-10-05 | Perforation | 1040.50 | 1043.00 | 17 |
2000-10-11 | Packing Device Capped w/Cement | 1030.00 | 1038.00 | 0 |
2000-10-11 | Perforation | 1006.50 | 1009.50 | 17 |
2002-02-10 | Packing Device Capped w/Cement | 992.00 | 1000.00 | 0 |
2002-02-11 | Perforation | 899.00 | 900.00 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2000 | 194 | 0.0 | 0.0 | 0.0 |
For data sources see[5]