X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0865092716020

Well Details

Well ID: 0865092716020
Loading map...
Location: 02/16-27-086-09W5/0
Location Alias: 02/16-27-86-09 W5M
Location Alias 2: 02/16-27-086-09 W5/00
Country: Canada
Province: Alberta
Township: 086
Meridian: 5
Range: 09
Section: 27
County/Municipality: Northern Sunrise County
Well Name: PPR 102 LOON 16-27-86-9
Operator Name: Prairie Provident Resources Canada Ltd.
License Number: 0476574
License Date: 2015-08-13
License Status: Issued
Spud Date: 2016-08-18
Final Drill Date: 2016-08-25
Well Total Depth: 2907.00 m
Surface Hole Latitude: 56.477925
Surface Hole Longitude: -115.322261

For data sources see[1][2]

Well History

Date Event
2015-08-13 Obtained License
2016-08-19 Surface Casing Operation Performed
2016-08-21 Direction Drilling Operation Performed - Deviate
2016-08-22 Direction Drilling Operation Performed - Horizontal
2016-08-25 Finished Drilling
2016-08-25 Well Log Performed
2016-08-25 Well Mode changed to Drilled and Cased
2016-08-26 Production Casing Operation Performed
2016-08-27 Rig Released
2016-09-06 Perforation Treatment Performed - Jet Perforation
2016-09-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2016-09-09 Perforation Treatment Performed - Fractured
2016-09-14 Well Began Production
2016-09-14 Well Fluid changed to Crude Oil
2016-09-14 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-08-18 Bonanza Drilling Inc. 8 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-08-21 1092.70 Deviate (5 - 79 degrees)
2016-08-22 1527.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-09-06 Perforation 2750.00 2751.00 20
2016-09-06 Perforation 1825.00 1826.00 20
2016-09-06 Perforation 1715.00 1716.00 20
2016-09-06 Perforation 1608.00 1609.00 20
2016-09-09 Fracture 2750.00 2751.00 0
2016-09-09 Fracture 2707.00 2708.00 0
2016-09-09 Fracture 2597.00 2598.00 0
2016-09-09 Fracture 2489.00 2490.00 0
2016-09-09 Fracture 2380.00 2381.00 0
2016-09-09 Fracture 2260.00 2261.00 0
2016-09-09 Fracture 2150.00 2151.00 0
2016-09-06 Perforation 2707.00 2708.00 20
2016-09-09 Fracture 2042.00 2043.00 0
2016-09-09 Fracture 1933.00 1934.00 0
2016-09-09 Fracture 1825.00 1826.00 0
2016-09-09 Fracture 1715.00 1716.00 0
2016-09-09 Fracture 1608.00 1609.00 0
2016-09-09 Acid Treatment 2750.00 2751.00 0
2016-09-09 Acid Treatment 2707.00 2708.00 0
2016-09-09 Acid Treatment 2597.00 2598.00 0
2016-09-09 Acid Treatment 2489.00 2490.00 0
2016-09-09 Acid Treatment 2380.00 2381.00 0
2016-09-06 Perforation 2597.00 2598.00 20
2016-09-09 Acid Treatment 2260.00 2261.00 0
2016-09-09 Acid Treatment 2150.00 2151.00 0
2016-09-09 Acid Treatment 2042.00 2043.00 0
2016-09-09 Acid Treatment 1933.00 1934.00 0
2016-09-09 Acid Treatment 1825.00 1826.00 0
2016-09-09 Acid Treatment 1715.00 1716.00 0
2016-09-09 Acid Treatment 1608.00 1609.00 0
2016-09-06 Perforation 2489.00 2490.00 20
2016-09-06 Perforation 2380.00 2381.00 20
2016-09-06 Perforation 2260.00 2261.00 20
2016-09-06 Perforation 2150.00 2151.00 20
2016-09-06 Perforation 2042.00 2043.00 20
2016-09-06 Perforation 1933.00 1934.00 20

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-09-09 2016-09-09 1,358 431 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 hydrochloric acid 7647-01-0 100 58.0359 N/A
water Not Available 100 48.5997 N/A
GBE-1:5 Trican Breaker non-hazardous ingredients Not Available 100 0.0397 N/A
propylene glycol 57-55-6 100 0.0397 N/A
CC-3 Trican Clay Control choline chloride 67-48-1 100 0.0605 N/A
formic acid 64-18-6 100 0.0605 N/A
non-hazardous ingredients Not Available 100 0.0605 N/A
AI-11 Trican Corrosion Inhibitor non-hazardous ingredients Not Available 100 0.2151 N/A
potassium iodide 7681-11-0 100 0.2151 N/A
propargyl alcohol 107-19-7 100 0.215 N/A
propargyl alcohol derivative 9393 100 0.2151 N/A
WXZ-2 Trican Crosslinker alkanolamine chelate of zirconium alkoxide 197980-53-3 100 0.0625 N/A
methanol 67-56-1 100 0.0625 N/A
n-propanol 71-23-8 100 0.0625 N/A
DF-1 Trican Defoamer non-hazardous ingredients Not Available 100 0.0053 N/A
GNE-2 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0401 N/A
propylene glycol 57-55-6 100 0.0401 N/A
FR-1s Trican Friction Reducer non-hazardous ingredients Not Available 100 0.0872 N/A
WG-33L Trican Gelling Agent carboxymethyl hydroxypropyl guar 68130-15-4 100 0.1516 N/A
mineral oil Not Available 100 0.1516 N/A
IC-11 Trican Iron Control 2-mercaptoethanol 60-24-2 100 0.1183 N/A
ammonia 7664-41-7 100 0.1183 N/A
cupric chloride dihydrate 10125-13-0 100 0.1183 N/A
potassium iodide 7681-11-0 100 0.1183 N/A
ASA-61 Trican Surfactant alkylbenzenesulfonic acid 68584-22-5 100 0.6043 N/A
benzenesulfonic acid. decyl(sulfophenoxy)-. disodium salt 36445-71-3 100 0.6043 N/A
dipropylene glycol 25265-71-8 100 0.6043 N/A
non-hazardous ingredients Not Available 100 0.6043 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-09-01 2016-09-09 Municipal Water 220

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 2584 0.0 0.0 0.0
2017 8583 0.0 0.0 0.0
2018 8479 0.0 0.0 0.0
2019 7588 0.0 0.0 0.0
2020 2111 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-08-18 No Incident Encountered 0.00 0.00
2016-09-06 No Incident Encountered 0.00 0.00

For data sources see[10]

References