X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0865092613030

Well Details

Well ID: 0865092613030
Loading map...
Location: 03/13-26-086-09W5/0
Location Alias: 03/13-26-86-09 W5M
Location Alias 2: 03/13-26-086-09 W5/00
Country: Canada
Province: Alberta
Township: 086
Meridian: 5
Range: 09
Section: 26
County/Municipality: Northern Sunrise County
Well Name: PPR 103 LOON 13-26-86-9
Operator Name: Prairie Provident Resources Canada Ltd.
License Number: 0434034
License Date: 2011-06-03
License Status: Issued
Spud Date: 2011-10-07
Final Drill Date: 2011-10-19
Well Total Depth: 2892.00 m
Surface Hole Latitude: 56.478073
Surface Hole Longitude: -115.316095

For data sources see[1][2]

Well History

Date Event
2011-06-03 Obtained License
2011-10-09 Surface Casing Operation Performed
2011-10-11 Direction Drilling Operation Performed - Horizontal
2011-10-19 Finished Drilling
2011-10-19 Well Mode changed to Drilled and Cased
2011-10-21 Production Casing Operation Performed
2011-10-21 Rig Released
2011-10-24 Well Log Performed
2011-10-31 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-01 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-02 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-23 Well Began Production
2011-12-23 Well Fluid changed to Crude Oil
2011-12-23 Well Mode changed to Pumping
2013-03-01 Well Began Injection
2013-03-01 Well Fluid changed to Water
2013-03-01 Well Type changed to Injection
2014-03-03 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-10-11 1112.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-10-31 Multi-Stage Fracture 2868.00 2868.10 0
2011-11-01 Multi-Stage Fracture 2348.50 2348.60 0
2011-11-01 Multi-Stage Fracture 2288.70 2288.80 0
2011-11-01 Multi-Stage Fracture 2239.80 2239.90 0
2011-11-01 Multi-Stage Fracture 2179.60 2179.70 0
2011-11-01 Multi-Stage Fracture 2130.00 2130.10 0
2011-11-01 Multi-Stage Fracture 2069.80 2069.90 0
2011-11-01 Multi-Stage Fracture 2019.10 2019.20 0
2011-11-01 Multi-Stage Fracture 1958.90 1959.00 0
2011-11-01 Multi-Stage Fracture 1905.30 1905.40 0
2011-11-02 Multi-Stage Fracture 1858.70 1858.80 0
2011-10-31 Multi-Stage Fracture 2806.30 2806.40 0
2011-11-02 Multi-Stage Fracture 1799.10 1799.20 0
2011-11-02 Multi-Stage Fracture 1752.40 1752.50 0
2011-11-02 Multi-Stage Fracture 1692.40 1692.50 0
2011-11-02 Multi-Stage Fracture 1641.70 1641.80 0
2011-11-02 Multi-Stage Fracture 1568.60 1568.70 0
2011-11-02 Multi-Stage Fracture 1505.70 1505.80 0
2014-03-03 Acid Treatment 2868.00 2868.10 0
2014-03-03 Acid Treatment 2806.30 2806.40 0
2014-03-03 Acid Treatment 2746.50 2746.60 0
2014-03-03 Acid Treatment 2673.20 2673.30 0
2011-10-31 Multi-Stage Fracture 2746.50 2746.60 0
2014-03-03 Acid Treatment 2624.70 2624.80 0
2014-03-03 Acid Treatment 2564.90 2565.00 0
2014-03-03 Acid Treatment 2505.10 2505.20 0
2014-03-03 Acid Treatment 2458.80 2458.90 0
2014-03-03 Acid Treatment 2398.90 2399.00 0
2014-03-03 Acid Treatment 2348.50 2348.60 0
2014-03-03 Acid Treatment 2288.70 2288.80 0
2014-03-03 Acid Treatment 2239.80 2239.90 0
2014-03-03 Acid Treatment 2179.60 2179.70 0
2014-03-03 Acid Treatment 2130.00 2130.10 0
2011-10-31 Multi-Stage Fracture 2673.20 2673.30 0
2014-03-03 Acid Treatment 2069.80 2069.90 0
2014-03-03 Acid Treatment 2019.10 2019.20 0
2014-03-03 Acid Treatment 1958.90 1959.00 0
2014-03-03 Acid Treatment 1905.30 1905.40 0
2014-03-03 Acid Treatment 1858.70 1858.80 0
2014-03-03 Acid Treatment 1799.10 1799.20 0
2014-03-03 Acid Treatment 1752.40 1752.50 0
2014-03-03 Acid Treatment 1692.40 1692.50 0
2014-03-03 Acid Treatment 1641.70 1641.80 0
2014-03-03 Acid Treatment 1568.60 1568.70 0
2011-10-31 Multi-Stage Fracture 2624.70 2624.80 0
2014-03-03 Acid Treatment 1505.70 1505.80 0
2011-10-31 Multi-Stage Fracture 2564.90 2565.00 0
2011-10-31 Multi-Stage Fracture 2505.10 2505.20 0
2011-11-01 Multi-Stage Fracture 2458.80 2458.90 0
2011-11-01 Multi-Stage Fracture 2398.90 2399.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 214 0.0 0.0 0.0
2012 7805 0.0 0.0 0.0
2013 836 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-03-02 No Incident Encountered 0.00 0.00
2013-02-09 No Incident Encountered 0.00 0.00
2016-07-27 No Incident Encountered 0.00 0.00
2018-09-21 No Incident Encountered 0.00 0.00

For data sources see[7]

References