If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0865092215000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.479052,"lon":-115.310489,"icon":""}]} |
Location: 00/15-22-086-09W5/0 | |
Location Alias: 00/15-22-86-09 W5M | |
Location Alias 2: 00/15-22-086-09 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 086 | |
Meridian: 5 | |
Range: 09 | |
Section: 22 | |
County/Municipality: Northern Sunrise County | |
Well Name: PPR LOON 15-22-86-9 | |
Operator Name: Prairie Provident Resources Canada Ltd. | |
License Number: 0441621 | |
License Date: 2011-12-19 | |
License Status: Issued | |
Spud Date: 2012-02-01 | |
Final Drill Date: 2012-02-12 | |
Well Total Depth: 2511.00 m | |
Surface Hole Latitude: 56.479052 | |
Surface Hole Longitude: -115.310489 |
Date | Event |
---|---|
2011-12-19 | Obtained License |
2012-02-01 | Surface Casing Operation Performed |
2012-02-04 | Direction Drilling Operation Performed - Horizontal |
2012-02-12 | Finished Drilling |
2012-02-12 | Well Mode changed to Drilled and Cased |
2012-02-13 | Production Casing Operation Performed |
2012-02-13 | Rig Released |
2012-02-29 | Well Log Performed |
2012-03-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-24 | Well Began Production |
2012-03-24 | Well Fluid changed to Crude Oil |
2012-03-24 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-02-01 | Chinook Drilling Inc. | 6 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-02-04 | 1103.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-03-09 | Multi-Stage Fracture | 2498.00 | 2498.10 | 0 |
2012-03-10 | Multi-Stage Fracture | 1940.20 | 1940.30 | 0 |
2012-03-10 | Multi-Stage Fracture | 1891.00 | 1891.10 | 0 |
2012-03-10 | Multi-Stage Fracture | 1791.90 | 1792.00 | 0 |
2012-03-10 | Multi-Stage Fracture | 1742.50 | 1742.60 | 0 |
2012-03-10 | Multi-Stage Fracture | 1692.50 | 1692.60 | 0 |
2012-03-10 | Multi-Stage Fracture | 1633.20 | 1633.30 | 0 |
2012-03-10 | Multi-Stage Fracture | 1587.10 | 1587.20 | 0 |
2012-03-10 | Multi-Stage Fracture | 1539.40 | 1539.50 | 0 |
2012-03-09 | Multi-Stage Fracture | 2434.60 | 2434.70 | 0 |
2012-03-09 | Multi-Stage Fracture | 2375.40 | 2375.50 | 0 |
2012-03-09 | Multi-Stage Fracture | 2301.20 | 2301.30 | 0 |
2012-03-09 | Multi-Stage Fracture | 2252.40 | 2252.50 | 0 |
2012-03-09 | Multi-Stage Fracture | 2186.50 | 2186.60 | 0 |
2012-03-10 | Multi-Stage Fracture | 2127.10 | 2127.20 | 0 |
2012-03-10 | Multi-Stage Fracture | 2067.90 | 2068.00 | 0 |
2012-03-10 | Multi-Stage Fracture | 1995.90 | 1996.00 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 5909 | 0.0 | 0.0 | 0.0 |
2013 | 7944 | 0.0 | 0.0 | 0.0 |
2014 | 8721 | 0.0 | 0.0 | 0.0 |
2015 | 8333 | 0.0 | 0.0 | 0.0 |
2016 | 8699 | 0.0 | 0.0 | 0.0 |
2017 | 8738 | 0.0 | 0.0 | 0.0 |
2018 | 8671 | 0.0 | 0.0 | 0.0 |
2019 | 8042 | 0.0 | 0.0 | 0.0 |
2020 | 1991 | 0.0 | 0.0 | 0.0 |
For data sources see[7]