If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0864060715080 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.440199,"lon":-110.939816,"icon":""}]} |
Location: 08/15-07-086-06W4/0 | |
Location Alias: 08/15-07-86-06 W4M | |
Location Alias 2: 08/15-07-086-06 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 086 | |
Meridian: 4 | |
Range: 06 | |
Section: 07 | |
County/Municipality: Regional Municipality of Wood Buffalo | |
Well Name: NEXEN OPTI 12P06 NEWBY 15-7-86-6 | |
Operator Name: CNOOC Petroleum North America ULC | |
License Number: 0426639 | |
License Date: 2010-11-30 | |
License Status: Issued | |
Spud Date: 2011-03-04 | |
Final Drill Date: 2011-03-29 | |
Well Total Depth: 1088.00 m | |
Surface Hole Latitude: 56.440199 | |
Surface Hole Longitude: -110.939816 |
Date | Event |
---|---|
2010-11-30 | Obtained License |
2011-03-04 | Direction Drilling Operation Performed - Deviate |
2011-03-05 | Surface Casing Operation Performed |
2011-03-07 | Direction Drilling Operation Performed - Horizontal |
2011-03-08 | Intermediate Casing Operation Performed |
2011-03-24 | Well Log Performed |
2011-03-29 | Finished Drilling |
2011-03-29 | Well Log Performed |
2011-03-29 | Well Mode changed to Drilled and Cased |
2011-03-31 | Liner Casing Operation Performed |
2011-03-31 | Perforation Treatment Performed - Slotted Liner or Casing |
2011-03-31 | Rig Released |
2012-01-01 | Well Began Production |
2012-01-01 | Well Type changed to Steam Assisted Gravity Drain |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-03-04 | 0.00 | Deviate (5 - 79 degrees) |
2011-03-07 | 338.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-03-31 | Slotted Liner | 443.70 | 1082.70 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 4194 | 0.0 | 0.0 | 0.0 |
2013 | 8461 | 0.0 | 0.0 | 0.0 |
2014 | 8552 | 0.0 | 0.0 | 0.0 |
2015 | 6631 | 0.0 | 0.0 | 0.0 |
2016 | 6585 | 0.0 | 0.0 | 0.0 |
2017 | 4165 | 0.0 | 0.0 | 0.0 |
2018 | 8627 | 0.0 | 0.0 | 0.0 |
2019 | 8668 | 0.0 | 0.0 | 0.0 |
2020 | 2180 | 0.0 | 0.0 | 0.0 |
For data sources see[6]