If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0856101312000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.373669,"lon":-119.421982,"icon":""}]} |
Location: 00/12-13-085-10W6/0 | |
Location Alias: 00/12-13-85-10 W6M | |
Location Alias 2: 00/12-13-085-10 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 085 | |
Meridian: 6 | |
Range: 10 | |
Section: 13 | |
County/Municipality: Clear Hills County | |
Well Name: NRE HZ CECIL 12-13-85-10 | |
Operator Name: Nine Ring Energy Development Inc. | |
License Number: 0484141 | |
License Date: 2017-06-16 | |
License Status: Suspension | |
Spud Date: 2017-08-02 | |
Final Drill Date: 2017-08-17 | |
Well Total Depth: 2833.00 m | |
Surface Hole Latitude: 56.373669 | |
Surface Hole Longitude: -119.421982 |
Date | Event |
---|---|
2017-06-16 | Obtained License |
2017-08-03 | Lost Circulation Occurred |
2017-08-05 | Surface Casing Operation Performed |
2017-08-08 | Direction Drilling Operation Performed - Deviate |
2017-08-08 | Well Log Performed |
2017-08-10 | Direction Drilling Operation Performed - Horizontal |
2017-08-10 | Intermediate Casing Operation Performed |
2017-08-14 | Well Log Performed |
2017-08-16 | Liner Casing Operation Performed |
2017-08-17 | Finished Drilling |
2017-08-17 | Rig Released |
2017-08-17 | Well Mode changed to Drilled and Cased |
2017-08-18 | Perforation Treatment Performed - Open-Hole Completion |
2017-09-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-11-01 | Well Began Production |
2017-11-01 | Well Fluid changed to Crude Oil |
2017-11-01 | Well Mode changed to Pumping |
2019-09-01 | Well Fluid changed to Crude Oil |
2019-09-01 | Well Mode changed to Suspended |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2017-08-02 | Horizon Drilling Inc. | 20 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2017-08-08 | 814.80 | Deviate (5 - 79 degrees) |
2017-08-10 | 1298.20 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-08-18 | Open Hole/Barefoot Completion | 2820.40 | 2833.00 | 0 |
2017-09-09 | Multi-Stage Fracture | 1960.20 | 1960.30 | 0 |
2017-09-09 | Multi-Stage Fracture | 1858.10 | 1858.20 | 0 |
2017-09-09 | Multi-Stage Fracture | 1756.30 | 1756.40 | 0 |
2017-09-09 | Multi-Stage Fracture | 1654.80 | 1654.90 | 0 |
2017-09-09 | Multi-Stage Fracture | 1552.80 | 1552.90 | 0 |
2017-09-09 | Multi-Stage Fracture | 1465.10 | 1465.20 | 0 |
2017-09-09 | Multi-Stage Fracture | 1340.00 | 1384.80 | 0 |
2017-09-09 | Multi-Stage Fracture | 2759.90 | 2760.60 | 0 |
2017-09-09 | Multi-Stage Fracture | 2687.20 | 2687.30 | 0 |
2017-09-09 | Multi-Stage Fracture | 2585.00 | 2585.10 | 0 |
2017-09-09 | Multi-Stage Fracture | 2483.50 | 2483.60 | 0 |
2017-09-09 | Multi-Stage Fracture | 2381.80 | 2381.90 | 0 |
2017-09-09 | Multi-Stage Fracture | 2280.40 | 2280.50 | 0 |
2017-09-09 | Multi-Stage Fracture | 2178.40 | 2178.50 | 0 |
2017-09-09 | Multi-Stage Fracture | 2047.80 | 2047.90 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-09-09 | 2017-09-09 | 1,132 | 937 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 79.6268 | N/A | |||
Sand (20/40) Ottawa | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 15.3876 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 15.3876 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 15.3876 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 15.3876 | N/A | ||||
SB Excel (20/40) | Canyon Technical Services | Crystalline silica. quartz | 14808-60-7 | 100 | 3.8469 | N/A | ||
Phenol formaldehyde resin | 9003-35-4 | 100 | 3.8469 | N/A | ||||
AcResin Activator W | Canyon Technical Services | Activator | Alcohols. C12-14 Secondary. Ethoxylated | 84133-50-6 | 100 | 0.1043 | N/A | |
Methyl Alcohol | 67-56-1 | 100 | 0.1043 | N/A | ||||
Polyethylene Glycol | 25322-68-3 | 100 | 0.1043 | N/A | ||||
AQUCAR DB20 Biocide | Trican Well Service | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0121 | N/A | |
2-mercaptoethanol | 60-24-2 | 100 | 0.0121 | N/A | ||||
dibromoacetonitrile | 3252-43-5 | 100 | 0.0121 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0121 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0121 | N/A | ||||
CAN-2301 Breaker (Oxidizer) | Canyon Technical Services | Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.0322 | N/A | |
Non-hazardous base ingredient(s) | Not Available | 100 | 0.0322 | N/A | ||||
CAN-1911 Clay Stabilizer | Canyon Technical Services | Clay Control | 1.6-Hexandiamine. dihydrochloride | 6055-52-3 | 100 | 0.1835 | N/A | |
Water | 7732-18-5 | 100 | 0.1835 | N/A | ||||
CAN-2200S Crosslinker / pH buffer (Borate) | Canyon Technical Services | Crosslinker | Monoethanolamine | 141-43-5 | 100 | 0.2147 | N/A | |
Water | 7732-18-5 | 100 | 0.2147 | N/A | ||||
CAN-2000 Gellant (Guar) | Canyon Technical Services | Gelling Agent | Polysacharide Suspension | Not Available | 100 | 0.5065 | N/A | |
GNE-2 Green Non Emulsifier | Trican Well Service | Surfactant | non-hazardous ingredients | Not Available | 100 | 0.0849 | N/A | |
propylene glycol | 57-55-6 | 100 | 0.0849 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-09-09 | 2017-09-09 | Surface Water - Runoff | 937 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 1407 | 0.0 | 0.0 | 0.0 |
2018 | 1383 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-08-03 | Lost Circulation | 110.00 | 110.00 |
2017-09-09 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]