X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0855182106120

Well Details

Well ID: 0855182106120
Loading map...
Location: 12/06-21-085-18W5/0
Location Alias: 12/06-21-85-18 W5M
Location Alias 2: 12/06-21-085-18 W5/00
Country: Canada
Province: Alberta
Township: 085
Meridian: 5
Range: 18
Section: 21
County/Municipality: Northern Sunrise County
Well Name: SCL 13-44 PREP CADOTTE 6-21-85-18
Operator Name: Shell Canada Limited
License Number: 0112642
License Date: 1985-01-21
License Status: RecExempt
Spud Date: 1985-04-21
Final Drill Date: 1985-04-24
Well Total Depth: 666.00 m
Surface Hole Latitude: 56.378630
Surface Hole Longitude: -116.781445

For data sources see[1][2]

Well History

Date Event
1985-01-21 Obtained License
1985-04-21 Direction Drilling Operation Performed - Deviate
1985-04-24 Finished Drilling
1985-04-24 Production Casing Operation Performed
1985-04-24 Rig Released
1985-04-25 Well Log Performed
1985-05-20 Well Mode changed to Drilled and Cased
1985-06-27 Well Log Performed
1985-07-30 Perforation Treatment Performed - Jet Perforation
1987-01-16 Well Began Production
1987-01-16 Well Fluid changed to Crude Bitumen
1987-01-16 Well Mode changed to Pumping
1987-04-01 Well Fluid changed to Crude Bitumen
1987-04-01 Well Type changed to Cyclical
2000-07-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-07-26 Plug Back Performed
2000-07-26 Well Fluid changed to Crude Bitumen
2000-07-26 Well Mode changed to Abandoned Zone
2000-07-26 Well Type changed to Cyclical
2001-11-13 Well Abandoned
2001-11-13 Well Fluid changed to Crude Bitumen
2001-11-13 Well Mode changed to Abandoned
2001-11-13 Well Type changed to Cyclical

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1985-04-21 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-07-30 Perforation 638.00 644.40 13
2000-07-26 Packing Device Capped w/Cement 573.00 589.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 4314 0.0 0.0 0.0
1988 7677 0.0 0.0 0.0
1989 6283 0.0 0.0 0.0
1990 8301 0.0 0.0 0.0
1991 8637 0.0 0.0 0.0
1992 8681 0.0 0.0 0.0
1993 8123 0.0 0.0 0.0
1994 8314 0.0 0.0 0.0
1995 8560 0.0 0.0 0.0
1996 7870 0.0 0.0 0.0
1997 8538 0.0 0.0 0.0
1998 8304 0.0 0.0 0.0
1999 7672 0.0 0.0 0.0
2000 3512 0.0 0.0 0.0

For data sources see[6]

References