If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0855182106100 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.380917,"lon":-116.787588,"icon":""}]} |
Location: 10/06-21-085-18W5/0 | |
Location Alias: 10/06-21-85-18 W5M | |
Location Alias 2: 10/06-21-085-18 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 085 | |
Meridian: 5 | |
Range: 18 | |
Section: 21 | |
County/Municipality: Northern Sunrise County | |
Well Name: SHELL 603 PREP CADOT 6-21-85-18 | |
Operator Name: Shell Canada Limited | |
License Number: 0101588 | |
License Date: 1983-06-06 | |
License Status: RecExempt | |
Spud Date: 1983-06-16 | |
Final Drill Date: 1983-06-21 | |
Well Total Depth: 688.00 m | |
Surface Hole Latitude: 56.380917 | |
Surface Hole Longitude: -116.787588 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1983-06-06 | Obtained License |
1983-06-21 | Finished Drilling |
1983-06-21 | Well Mode changed to Drilled and Cased |
1983-06-23 | Production Casing Operation Performed |
1983-06-24 | Rig Released |
1983-09-04 | Perforation Treatment Performed - Jet Perforation |
1984-02-01 | Well Began Production |
1984-02-01 | Well Fluid changed to Crude Bitumen |
1984-02-01 | Well Type changed to Cyclical |
1999-09-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-09-12 | Plug Back Performed |
1999-09-12 | Well Fluid changed to Crude Bitumen |
1999-09-12 | Well Mode changed to Abandoned Zone |
1999-09-12 | Well Type changed to Cyclical |
1999-10-08 | Well Abandoned |
1999-10-08 | Well Fluid changed to Crude Bitumen |
1999-10-08 | Well Mode changed to Abandoned |
1999-10-08 | Well Type changed to Cyclical |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1983-09-04 | Perforation | 642.00 | 648.00 | 4 |
1999-09-12 | Packing Device Capped w/Cement | 596.00 | 610.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1984 | 4329 | 0.0 | 0.0 | 0.0 |
1985 | 6423 | 0.0 | 0.0 | 0.0 |
1986 | 4264 | 0.0 | 0.0 | 0.0 |
1987 | 6939 | 0.0 | 0.0 | 0.0 |
1988 | 6712 | 0.0 | 0.0 | 0.0 |
1989 | 7855 | 0.0 | 0.0 | 0.0 |
1990 | 8702 | 0.0 | 0.0 | 0.0 |
1991 | 8554 | 0.0 | 0.0 | 0.0 |
1992 | 8757 | 0.0 | 0.0 | 0.0 |
1993 | 8305 | 0.0 | 0.0 | 0.0 |
1994 | 8691 | 0.0 | 0.0 | 0.0 |
1995 | 8608 | 0.0 | 0.0 | 0.0 |
1996 | 7386 | 0.0 | 0.0 | 0.0 |
1997 | 7655 | 0.0 | 0.0 | 0.0 |
1998 | 8630 | 0.0 | 0.0 | 0.0 |
1999 | 5386 | 0.0 | 0.0 | 0.0 |
For data sources see[5]