X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0855182106070

Well Details

Well ID: 0855182106070
Loading map...
Location: 07/06-21-085-18W5/0
Location Alias: 07/06-21-85-18 W5M
Location Alias 2: 07/06-21-085-18 W5/00
Country: Canada
Province: Alberta
Township: 085
Meridian: 5
Range: 18
Section: 21
County/Municipality: Northern Sunrise County
Well Name: SHELL 6 PREP CADOT 6-21-85-18
Operator Name: Shell Canada Limited
License Number: 0045280
License Date: 1973-03-01
License Status: RecExempt
Spud Date: 1973-03-05
Final Drill Date: 1973-03-15
Well Total Depth: 676.60 m
Surface Hole Latitude: 56.381118
Surface Hole Longitude: -116.784332

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-03-01 Obtained License
1973-03-09 Drill Stem Test Performed
1973-03-10 Drill Stem Test Performed
1973-03-12 Drill Stem Test Performed
1973-03-13 Drill Stem Test Performed
1973-03-15 Finished Drilling
1973-03-15 Well Mode changed to Drilled and Cased
1973-03-16 Production Casing Operation Performed
1973-09-08 Perforation Treatment Performed - Jet Perforation
1973-10-01 Well Began Production
1973-10-01 Well Fluid changed to Crude Bitumen
1973-10-01 Well Type changed to Cyclical
1974-05-10 Well Log Performed
1974-05-13 Perforation Treatment Performed - Jet Perforation
1974-05-13 Well Log Performed
1974-10-01 Well Fluid changed to Crude Bitumen
1974-10-01 Well Mode changed to Suspended
1974-10-01 Well Type changed to Cyclical
1983-11-10 Well Fluid changed to Crude Bitumen
1983-11-10 Well Type changed to Cyclical
1999-09-05 Well Fluid changed to Crude Bitumen
1999-09-05 Well Mode changed to Suspended
1999-09-05 Well Type changed to Cyclical
1999-09-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-09-06 Plug Back Performed
1999-09-06 Well Fluid changed to Crude Bitumen
1999-09-06 Well Mode changed to Abandoned Zone
1999-09-06 Well Type changed to Cyclical
1999-10-07 Well Abandoned
1999-10-07 Well Fluid changed to Crude Bitumen
1999-10-07 Well Mode changed to Abandoned
1999-10-07 Well Type changed to Cyclical

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-09-08 Perforation 572.40 578.50 4
1974-05-13 Perforation 551.70 556.30 4
1974-05-13 Perforation 559.30 565.40 4
1974-05-13 Perforation 572.40 575.00 4
1999-09-06 Packing Device Capped w/Cement 532.00 543.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1973 24 0.0 0.0 0.0
1974 3253 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 5570 0.0 0.0 0.0
1985 6141 0.0 0.0 0.0
1986 4964 0.0 0.0 0.0
1987 5260 0.0 0.0 0.0
1988 8151 0.0 0.0 0.0
1989 7978 0.0 0.0 0.0
1990 8673 0.0 0.0 0.0
1991 8516 0.0 0.0 0.0
1992 8757 0.0 0.0 0.0
1993 8185 0.0 0.0 0.0
1994 8643 0.0 0.0 0.0
1995 8608 0.0 0.0 0.0
1996 6155 0.0 0.0 0.0
1997 7705 0.0 0.0 0.0
1998 1785 0.0 0.0 0.0
1999 0 0.0 0.0 0.0

For data sources see[5]

References