If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0846122810000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.315354,"lon":-119.832882,"icon":""}]} |
Location: 00/10-28-084-12W6/0 | |
Location Alias: 00/10-28-84-12 W6M | |
Location Alias 2: 00/10-28-084-12 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 084 | |
Meridian: 6 | |
Range: 12 | |
Section: 28 | |
County/Municipality: Clear Hills County | |
Well Name: CNRL BDYLKS 10-28-84-12 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0160125 | |
License Date: 1993-07-30 | |
License Status: Abandoned | |
Spud Date: 1993-08-07 | |
Final Drill Date: 1993-08-19 | |
Well Total Depth: 1973.00 m | |
Surface Hole Latitude: 56.315354 | |
Surface Hole Longitude: -119.832882 |
Date | Event |
---|---|
1993-07-30 | Obtained License |
1993-08-07 | Lost Circulation Occurred |
1993-08-08 | Surface Casing Operation Performed |
1993-08-18 | Drill Stem Test Performed |
1993-08-19 | Finished Drilling |
1993-08-19 | Well Log Performed |
1993-08-19 | Well Mode changed to Drilled and Cased |
1993-08-20 | Drill Stem Test Performed |
1993-08-22 | Production Casing Operation Performed |
1993-08-22 | Rig Released |
1993-09-23 | Well Log Performed |
1993-09-24 | Perforation Treatment Performed - Jet Perforation |
1993-09-26 | Perforation Treatment Performed - Fractured |
1993-11-08 | Well Began Production |
1993-11-08 | Well Fluid changed to Gas |
1993-11-08 | Well Mode changed to Flowing |
2005-06-01 | Well Fluid changed to Gas |
2005-06-01 | Well Mode changed to Suspended |
2006-07-27 | Well Fluid changed to Gas |
2006-07-27 | Well Mode changed to Flowing |
2007-01-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-01-07 | Perforation Treatment Performed - Jet Perforation |
2007-01-07 | Plug Back Performed |
2007-01-07 | Well Fluid changed to Gas |
2007-01-07 | Well Mode changed to Abandoned Zone |
2007-01-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-01-16 | Plug Back Performed |
2008-08-15 | Perforation Treatment Performed - Jet Perforation |
2008-08-16 | Perforation Treatment Performed - Cement Plug |
2010-02-05 | Well Log Performed |
2010-02-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2010-02-11 | Perforation Treatment Performed - Jet Perforation |
2010-02-12 | Perforation Treatment Performed - Cement Plug |
2010-02-18 | Perforation Treatment Performed - Jet Perforation |
2010-02-19 | Perforation Treatment Performed - Remedial Casing |
2010-02-25 | Well Log Performed |
2010-02-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-02-26 | Well Log Performed |
2010-02-27 | Perforation Treatment Performed - Jet Perforation |
2010-02-27 | Well Log Performed |
2010-02-28 | Perforation Treatment Performed - Remedial Casing |
2010-03-05 | Perforation Treatment Performed - Jet Perforation |
2010-03-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2010-03-08 | Perforation Treatment Performed - Remedial Casing |
2010-04-06 | Perforation Treatment Performed - Jet Perforation |
2010-04-07 | Perforation Treatment Performed - Remedial Casing |
2010-04-15 | Perforation Treatment Performed - Jet Perforation |
2010-04-15 | Perforation Treatment Performed - Remedial Casing |
2010-06-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-06-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-06-08 | Plug Back Performed |
2010-06-11 | Well Abandoned |
2011-02-05 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1993-09-24 | Perforation | 1903.00 | 1907.00 | 14 |
2010-02-11 | Acid Treatment | 760.00 | 760.10 | 0 |
2010-02-11 | Acid Treatment | 757.00 | 757.10 | 0 |
2010-02-12 | Cement Plug | 674.00 | 770.00 | 0 |
2010-02-18 | Perforation | 568.00 | 568.30 | 1 |
2010-02-18 | Perforation | 538.00 | 538.30 | 1 |
2010-02-19 | Remedial Casing Cementing | 568.00 | 568.30 | 0 |
2010-02-19 | Remedial Casing Cementing | 538.00 | 538.30 | 0 |
2010-02-26 | Packing Device Capped w/Cement | 746.00 | 754.00 | 0 |
2010-02-26 | Packing Device Capped w/Cement | 521.00 | 529.00 | 0 |
2010-02-27 | Perforation | 398.00 | 398.30 | 1 |
1993-09-26 | Fracture | 1903.00 | 1907.00 | 0 |
2010-02-27 | Perforation | 354.00 | 354.30 | 1 |
2010-02-28 | Remedial Casing Cementing | 398.00 | 398.30 | 0 |
2010-02-28 | Remedial Casing Cementing | 354.00 | 354.30 | 0 |
2010-03-05 | Perforation | 696.40 | 697.00 | 1 |
2010-03-05 | Perforation | 695.00 | 695.60 | 1 |
2010-03-06 | Acid Treatment | 695.00 | 695.60 | 0 |
2010-03-06 | Acid Treatment | 696.40 | 697.00 | 0 |
2010-03-08 | Remedial Casing Cementing | 696.40 | 697.00 | 0 |
2010-03-08 | Remedial Casing Cementing | 695.00 | 695.60 | 0 |
2010-04-06 | Perforation | 708.40 | 709.00 | 1 |
2007-01-07 | Packing Device Capped w/Cement | 1877.00 | 1895.30 | 0 |
2010-04-07 | Remedial Casing Cementing | 708.40 | 709.00 | 0 |
2010-04-15 | Perforation | 1583.00 | 1587.00 | 1 |
2010-04-15 | Remedial Casing Cementing | 1583.00 | 1587.00 | 0 |
2010-06-07 | Packing Device Capped w/Cement | 1567.00 | 1575.00 | 0 |
2010-06-07 | Packing Device Capped w/Cement | 682.00 | 690.00 | 0 |
2010-06-08 | Packing Device Capped w/Cement | 522.00 | 530.00 | 0 |
2010-06-08 | Packing Device Capped w/Cement | 337.00 | 345.00 | 0 |
2007-01-07 | Perforation | 1583.00 | 1587.00 | 8 |
2007-01-16 | Packing Device Capped w/Cement | 1567.00 | 1575.30 | 0 |
2008-08-15 | Perforation | 349.00 | 350.00 | 17 |
2008-08-16 | Cement Plug | 310.00 | 350.00 | 0 |
2010-02-11 | Perforation | 760.00 | 760.10 | 1 |
2010-02-11 | Perforation | 757.00 | 757.10 | 1 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1993 | 1271 | 0.0 | 0.0 | 0.0 |
1994 | 4943 | 0.0 | 0.0 | 0.0 |
1995 | 3237 | 0.0 | 0.0 | 0.0 |
1996 | 3250 | 0.0 | 0.0 | 0.0 |
1997 | 817 | 0.0 | 0.0 | 0.0 |
2006 | 589 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1993-08-07 | Lost Circulation | 30.00 | 70.00 |
For data sources see[6]