X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0846082505000

Well Details

Well ID: 0846082505000
Loading map...
Location: 00/05-25-084-08W6/0
Location Alias: 00/05-25-84-08 W6M
Location Alias 2: 00/05-25-084-08 W6/00
Country: Canada
Province: Alberta
Township: 084
Meridian: 6
Range: 08
Section: 25
County/Municipality: Clear Hills County
Well Name: CNRL CECIL 5-25-84-8
Operator Name: Harvest Operations Corp.
License Number: 0295415
License Date: 2003-11-03
License Status: Suspension
Spud Date: 2003-12-18
Final Drill Date: 2004-01-14
Well Total Depth: 2495.00 m
Surface Hole Latitude: 56.312666
Surface Hole Longitude: -119.106134

For data sources see[1][2]

Well History

Date Event
2003-11-03 Obtained License
2003-12-19 Lost Circulation Occurred
2003-12-20 Surface Casing Operation Performed
2003-12-28 Well Log Performed
2003-12-30 Direction Drilling Operation Performed - Horizontal
2004-01-04 Well Log Performed
2004-01-06 Production Casing Operation Performed
2004-01-10 Well Log Performed
2004-01-14 Finished Drilling
2004-01-14 Well Log Performed
2004-01-14 Well Mode changed to Drilled and Cased
2004-01-15 Perforation Treatment Performed - Open-Hole Completion
2004-01-15 Rig Released
2004-03-18 Well Began Production
2004-03-18 Well Fluid changed to Crude Oil
2004-03-18 Well Mode changed to Pumping
2011-01-08 Perforation Treatment Performed - Multi-Stage Fracture
2015-11-01 Well Fluid changed to Crude Oil
2015-11-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2003-12-30 795.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-01-15 Open Hole/Barefoot Completion 1246.00 2495.00 0
2011-01-08 Multi-Stage Fracture 2360.30 2360.40 0
2011-01-08 Multi-Stage Fracture 2180.00 2180.10 0
2011-01-08 Multi-Stage Fracture 2000.40 2000.50 0
2011-01-08 Multi-Stage Fracture 1821.60 1821.70 0
2011-01-08 Multi-Stage Fracture 1640.00 1640.10 0
2011-01-08 Multi-Stage Fracture 1458.40 1458.50 0
2011-01-08 Multi-Stage Fracture 1276.90 1277.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 6914 0.0 0.0 0.0
2005 8669 0.0 0.0 0.0
2006 8724 0.0 0.0 0.0
2007 8623 0.0 0.0 0.0
2008 8543 0.0 0.0 0.0
2009 8714 0.0 0.0 0.0
2010 7735 0.0 0.0 0.0
2011 6894 0.0 0.0 0.0
2012 8348 0.0 0.0 0.0
2013 8420 0.0 0.0 0.0
2014 6434 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2003-12-19 Lost Circulation 258.00 310.00

For data sources see[7]

References