X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0846081014032

Well Details

Well ID: 0846081014032
Loading map...
Location: 03/14-10-084-08W6/2
Location Alias: 03/14-10-84-08 W6M
Location Alias 2: 03/14-10-084-08 W6/02
Country: Canada
Province: Alberta
Township: 084
Meridian: 6
Range: 08
Section: 10
County/Municipality: Saddle Hills County
Well Name: DAYLIGHT ET AL 103 CECIL 14-10-84-8
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0332584
License Date: 2005-06-09
License Status: Issued
Spud Date: 2005-06-19
Final Drill Date: 2005-06-26
Well Total Depth: 1649.00 m
Surface Hole Latitude: 56.275641
Surface Hole Longitude: -119.176888

For data sources see[1][2]

Well History

Date Event
2005-06-09 Obtained License
2005-06-20 Surface Casing Operation Performed
2005-06-26 Finished Drilling
2005-06-26 Well Log Performed
2005-06-26 Well Mode changed to Drilled and Cased
2005-06-27 Drill Stem Test Performed
2005-06-28 Production Casing Operation Performed
2005-06-28 Rig Released
2005-07-02 Perforation Treatment Performed - Jet Perforation
2005-07-24 Well Log Performed
2005-07-26 Well Log Performed
2006-01-09 Well Log Performed
2006-06-06 Well Log Performed
2008-06-08 Perforation Treatment Performed - Cement Squeeze
2008-06-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-06-12 Perforation Treatment Performed - Cement Squeeze
2008-06-12 Plug Back Performed
2008-06-18 Perforation Treatment Performed - Jet Perforation
2008-06-18 Well Log Performed
2008-06-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-06-25 Perforation Treatment Performed - Jet Perforation
2008-06-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-06-27 Well Log Performed
2008-07-01 Well Log Performed
2008-09-25 Well Began Injection
2008-09-25 Well Fluid changed to Water
2008-09-25 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-07-02 Perforation 1545.00 1547.50 17
2005-07-02 Perforation 1592.00 1596.00 17
2008-06-08 Cement Squeeze 1592.00 1596.00 0
2008-06-11 Acid Treatment 1545.00 1547.50 0
2008-06-12 Cement Squeeze 1545.00 1547.50 0
2008-06-18 Perforation 1622.40 1624.50 17
2008-06-20 Acid Treatment 1622.40 1624.50 0
2008-06-25 Perforation 1620.00 1624.50 17
2008-06-26 Acid Treatment 1620.00 1624.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References