If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0836060811003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.185025,"lon":-118.916081,"icon":""}]} |
Location: 00/11-08-083-06W6/3 | |
Location Alias: 00/11-08-83-06 W6M | |
Location Alias 2: 00/11-08-083-06 W6/03 | |
Country: Canada | |
Province: Alberta | |
Township: 083 | |
Meridian: 6 | |
Range: 06 | |
Section: 08 | |
County/Municipality: Clear Hills County | |
Well Name: TALISMAN OAK 11-8-83-6 | |
Operator Name: Repsol Oil & Gas Canada Inc. | |
License Number: 0052379 | |
License Date: 1975-01-06 | |
License Status: Abandoned | |
Spud Date: 1975-01-10 | |
Final Drill Date: 1975-02-02 | |
Well Total Depth: 2333.20 m | |
Surface Hole Latitude: 56.185025 | |
Surface Hole Longitude: -118.916081 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1975-01-06 | Obtained License |
1975-01-10 | Lost Circulation Occurred |
1975-01-17 | Drill Stem Test Performed |
1975-01-29 | Drill Stem Test Performed |
1975-02-02 | Finished Drilling |
1975-02-02 | Well Mode changed to Drilled and Cased |
1975-02-04 | Drill Stem Test Performed |
1975-02-08 | Production Casing Operation Performed |
1975-02-24 | Perforation Treatment Performed - Jet Perforation |
1975-02-25 | Perforation Treatment Performed - Cement Squeeze |
1975-02-28 | Perforation Treatment Performed - Jet Perforation |
1975-03-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1975-03-02 | Perforation Treatment Performed - Cement Squeeze |
1975-03-03 | Perforation Treatment Performed - Jet Perforation |
1975-03-04 | Perforation Treatment Performed - Cement Squeeze |
1975-03-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1975-03-08 | Perforation Treatment Performed - Jet Perforation |
1994-10-04 | Well Log Performed |
1995-11-30 | Well Log Performed |
2002-02-11 | Well Log Performed |
2002-02-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-02-14 | Plug Back Performed |
2002-02-14 | Well Log Performed |
2002-02-15 | Perforation Treatment Performed - Jet Perforation |
2002-02-15 | Well Log Performed |
2002-02-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-02-19 | Plug Back Performed |
2002-02-20 | Perforation Treatment Performed - Jet Perforation |
2002-02-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-02-21 | Plug Back Performed |
2002-02-21 | Well Log Performed |
2002-02-21 | Well Mode changed to Abandoned Zone |
2002-02-22 | Perforation Treatment Performed - Jet Perforation |
2002-02-22 | Well Log Performed |
2002-02-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-02-23 | Plug Back Performed |
2002-02-23 | Well Log Performed |
2002-02-24 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1975-02-24 | Perforation | 2232.70 | 2235.70 | 7 |
2002-02-14 | Packing Device Capped w/Cement | 2181.00 | 2189.00 | 0 |
2002-02-15 | Perforation | 1560.00 | 1562.50 | 14 |
2002-02-19 | Packing Device Capped w/Cement | 1547.00 | 1555.00 | 0 |
2002-02-20 | Perforation | 948.50 | 952.80 | 17 |
2002-02-21 | Packing Device Capped w/Cement | 936.00 | 944.00 | 0 |
2002-02-22 | Perforation | 907.80 | 912.00 | 14 |
2002-02-23 | Packing Device Capped w/Cement | 892.00 | 900.00 | 0 |
1975-02-25 | Cement Squeeze | 2232.70 | 2235.70 | 0 |
1975-02-28 | Perforation | 1678.80 | 1682.50 | 7 |
1975-03-01 | Acid Treatment | 1678.80 | 1682.50 | 0 |
1975-03-02 | Cement Squeeze | 1678.80 | 1682.50 | 0 |
1975-03-03 | Perforation | 968.00 | 971.10 | 7 |
1975-03-04 | Cement Squeeze | 968.00 | 971.10 | 0 |
1975-03-08 | Perforation | 2211.60 | 2214.70 | 7 |
1975-03-08 | Acid Treatment | 2211.60 | 2214.70 | 0 |
For data sources see[4]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1975-01-10 | Lost Circulation | 121.90 | 121.90 |
For data sources see[5]