X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0835142906000

Well Details

Well ID: 0835142906000
Loading map...
Location: 00/06-29-083-14W5/0
Location Alias: 00/06-29-83-14 W5M
Location Alias 2: 00/06-29-083-14 W5/00
Country: Canada
Province: Alberta
Township: 083
Meridian: 5
Range: 14
Section: 29
County/Municipality: Northern Sunrise County
Well Name: SUMMERLAND SLAVE 6-29-83-14
Operator Name: Summerland Energy Inc.
License Number: 0116336
License Date: 1985-07-22
License Status: RecCertified
Spud Date: 1985-07-31
Final Drill Date: 1985-08-24
Well Total Depth: 1834.00 m
Surface Hole Latitude: 56.222548
Surface Hole Longitude: -116.179452

For data sources see[1][2]

Well History

Date Event
1985-07-22 Obtained License
1985-08-02 Surface Casing Operation Performed
1985-08-24 Finished Drilling
1985-08-24 Well Log Performed
1985-08-24 Well Mode changed to Drilled and Cased
1985-08-25 Drill Stem Test Performed
1985-08-27 Production Casing Operation Performed
1985-08-28 Rig Released
1985-10-03 Perforation Treatment Performed - Jet Perforation
1985-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-10-09 Perforation Treatment Performed - Cement Squeeze
1985-10-11 Perforation Treatment Performed - Jet Perforation
1985-10-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-11-16 Well Began Production
1985-11-16 Well Fluid changed to Crude Oil
1985-11-16 Well Mode changed to Pumping
1986-01-25 Well Fluid changed to Crude Oil
1986-01-25 Well Mode changed to Suspended
1994-02-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-02-24 Plug Back Performed
1994-02-25 Perforation Treatment Performed - Cement Plug
1994-02-25 Well Fluid changed to Crude Oil
1994-02-25 Well Mode changed to Abandoned
1994-03-01 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-10-03 Perforation 1801.50 1804.00 13
1985-10-03 Perforation 1807.00 1809.00 13
1985-10-04 Acid Treatment 1801.50 1809.00 0
1985-10-09 Cement Squeeze 1801.50 1804.00 0
1985-10-11 Perforation 1794.00 1799.00 13
1985-10-12 Acid Treatment 1794.00 1799.00 0
1994-02-24 Packing Device Capped w/Cement 1761.70 1771.70 0
1994-02-25 Cement Plug 320.00 373.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 1053 0.0 0.0 0.0
1986 243 0.0 0.0 0.0

For data sources see[5]

References