X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0826130104000

Well Details

Well ID: 0826130104000
Loading map...
Location: 00/04-01-082-13W6/0
Location Alias: 00/04-01-82-13 W6M
Location Alias 2: 00/04-01-082-13 W6/00
Country: Canada
Province: Alberta
Township: 082
Meridian: 6
Range: 13
Section: 01
County/Municipality: Saddle Hills County
Well Name: GLENOGLE DOE 4-1-82-13
Operator Name: Glenogle Energy Inc.
License Number: 0225452
License Date: 1999-08-17
License Status: Amended
Spud Date: 1999-08-22
Final Drill Date: 1999-09-05
Well Total Depth: 1813.00 m
Surface Hole Latitude: 56.078851
Surface Hole Longitude: -119.892413

For data sources see[1][2]

Well History

Date Event
1999-08-17 Obtained License
1999-08-23 Surface Casing Operation Performed
1999-08-24 Direction Drilling Operation Performed - Deviate
1999-09-05 Finished Drilling
1999-09-06 Well Log Performed
1999-09-09 Production Casing Operation Performed
1999-09-09 Rig Released
1999-09-09 Well Mode changed to Drilled and Cased
1999-09-20 Well Log Performed
1999-09-21 Perforation Treatment Performed - Jet Perforation
1999-09-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-09-28 Perforation Treatment Performed - Jet Perforation
1999-10-01 Perforation Treatment Performed - Jet Perforation
1999-10-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-10-13 Perforation Treatment Performed - Jet Perforation
1999-10-15 Perforation Treatment Performed - Acid Wash - No Pressure
1999-11-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-11-12 Plug Back Performed
1999-11-13 Perforation Treatment Performed - Jet Perforation
1999-11-16 Perforation Treatment Performed - Acid Wash - No Pressure
1999-12-10 Well Began Production
1999-12-10 Well Fluid changed to Gas
1999-12-10 Well Mode changed to Flowing
2019-11-01 Well Fluid changed to Gas
2019-11-01 Well Mode changed to Suspended
2020-01-01 Well Fluid changed to Gas
2020-01-01 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1999-08-24 330.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-09-21 Perforation 1733.50 1736.00 17
1999-11-13 Perforation 1553.50 1555.50 17
1999-11-16 Acid Wash 1553.50 1555.50 0
1999-09-24 Acid Treatment 1733.50 1736.00 0
1999-09-28 Perforation 1729.00 1731.00 17
1999-10-01 Perforation 1718.50 1720.00 17
1999-10-01 Perforation 1722.00 1724.00 17
1999-10-05 Acid Treatment 1718.50 1724.00 0
1999-10-13 Perforation 1698.00 1704.00 17
1999-10-15 Acid Wash 1698.00 1704.00 0
1999-11-12 Packing Device Capped w/Cement 1687.00 1695.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 442 0.0 0.0 0.0
2000 8147 0.0 0.0 0.0
2001 6919 0.0 0.0 0.0
2002 8367 0.0 0.0 0.0
2003 8428 0.0 0.0 0.0
2004 8113 0.0 0.0 0.0
2005 8454 0.0 0.0 0.0
2006 8677 0.0 0.0 0.0
2007 8556 0.0 0.0 0.0
2008 8533 0.0 0.0 0.0
2009 8702 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8687 0.0 0.0 0.0
2012 8743 0.0 0.0 0.0
2013 8443 0.0 0.0 0.0
2014 8679 0.0 0.0 0.0
2015 8345 0.0 0.0 0.0
2016 8488 0.0 0.0 0.0
2017 7782 0.0 0.0 0.0
2018 8571 0.0 0.0 0.0
2019 7247 0.0 0.0 0.0
2020 96 0.0 0.0 0.0

For data sources see[6]

References