X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0826091312000

Well Details

Well ID: 0826091312000
Loading map...
Location: 00/12-13-082-09W6/0
Location Alias: 00/12-13-82-09 W6M
Location Alias 2: 00/12-13-082-09 W6/00
Country: Canada
Province: Alberta
Township: 082
Meridian: 6
Range: 09
Section: 13
County/Municipality: Saddle Hills County
Well Name: DAYLIGHT MULLIGAN 12-13-82-9
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0215201
License Date: 1998-05-14
License Status: Abandoned
Spud Date: 1998-06-09
Final Drill Date: 1998-06-11
Well Total Depth: 655.00 m
Surface Hole Latitude: 56.112108
Surface Hole Longitude: -119.273995

For data sources see[1][2]

Well History

Date Event
1998-05-14 Obtained License
1998-06-11 Finished Drilling
1998-06-11 Production Casing Operation Performed
1998-06-11 Rig Released
1998-06-11 Well Log Performed
1998-06-11 Well Mode changed to Drilled and Cased
1998-07-04 Perforation Treatment Performed - Open-Hole Completion
1998-07-13 Well Log Performed
1998-08-30 Well Began Production
1998-08-30 Well Fluid changed to Gas
1998-08-30 Well Mode changed to Flowing
2002-02-03 Perforation Treatment Performed - Bridge Plug No Cement Required
2002-02-03 Well Log Performed
2002-02-04 Perforation Treatment Performed - Jet Perforation
2002-02-04 Well Log Performed
2002-02-05 Perforation Treatment Performed - Fractured
2011-09-01 Well Fluid changed to Gas
2011-09-01 Well Mode changed to Suspended
2017-10-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-10-21 Plug Back Performed
2017-10-21 Well Fluid changed to Gas
2017-10-21 Well Mode changed to Abandoned Zone
2017-10-28 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-07-04 Open Hole/Barefoot Completion 646.80 655.00 0
2017-10-21 Packing Device Capped w/Cement 236.00 244.00 0
2002-02-03 Bridge Plug, No Cement 646.80 655.00 0
2002-02-04 Perforation 289.50 291.00 17
2002-02-04 Perforation 270.00 271.00 17
2002-02-04 Perforation 250.00 253.00 17
2002-02-05 Fracture 289.50 291.00 0
2002-02-05 Fracture 270.00 271.00 0
2002-02-05 Fracture 250.00 253.00 0
2017-10-21 Packing Device Capped w/Cement 630.00 638.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 2948 0.0 0.0 0.0
1999 7150 0.0 0.0 0.0
2000 4949 0.0 0.0 0.0
2001 4618 0.0 0.0 0.0
2002 142 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-10-22 No Incident Encountered 0.00 0.00

For data sources see[6]

References