If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0826090311020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.082415,"lon":-119.323795,"icon":""}]} |
Location: 02/11-03-082-09W6/0 | |
Location Alias: 02/11-03-82-09 W6M | |
Location Alias 2: 02/11-03-082-09 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 082 | |
Meridian: 6 | |
Range: 09 | |
Section: 03 | |
County/Municipality: Saddle Hills County | |
Well Name: DAYLIGHT MULLIGAN 11-3-82-9 | |
Operator Name: Sinopec Daylight Energy Ltd. | |
License Number: 0144669 | |
License Date: 1990-07-03 | |
License Status: Suspension | |
Spud Date: 1990-07-06 | |
Final Drill Date: 1990-07-13 | |
Well Total Depth: 1208.00 m | |
Surface Hole Latitude: 56.082415 | |
Surface Hole Longitude: -119.323795 |
Date | Event |
---|---|
1990-07-03 | Obtained License |
1990-07-06 | Surface Casing Operation Performed |
1990-07-09 | Well Log Performed |
1990-07-11 | Drill Stem Test Performed |
1990-07-13 | Finished Drilling |
1990-07-13 | Well Log Performed |
1990-07-14 | Drill Stem Test Performed |
1990-07-15 | Lost Circulation Occurred |
1990-07-15 | Production Casing Operation Performed |
1990-07-15 | Rig Released |
1990-08-22 | Well Log Performed |
1990-08-23 | Well Log Performed |
1990-08-24 | Perforation Treatment Performed - Jet Perforation |
1990-11-05 | Well Log Performed |
1990-11-06 | Perforation Treatment Performed - Jet Perforation |
1990-11-08 | Well Mode changed to Drilled and Cased |
1991-06-02 | Well Began Production |
1991-06-02 | Well Fluid changed to Gas |
1991-06-02 | Well Mode changed to Flowing |
1998-10-01 | Well Fluid changed to Gas |
1998-10-01 | Well Mode changed to Suspended |
2000-07-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-07-29 | Perforation Treatment Performed - Jet Perforation |
2000-07-29 | Plug Back Performed |
2000-07-29 | Well Fluid changed to Gas |
2000-07-29 | Well Log Performed |
2000-07-29 | Well Mode changed to Abandoned Zone |
2000-08-02 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1990-08-24 | Perforation | 1157.00 | 1158.50 | 13 |
1990-11-06 | Perforation | 1157.00 | 1158.50 | 13 |
2000-07-29 | Packing Device Capped w/Cement | 1139.00 | 1149.00 | 0 |
2000-07-29 | Perforation | 1059.00 | 1062.50 | 17 |
2000-08-02 | Fracture | 1059.00 | 1062.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1991 | 486 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1990-07-15 | Lost Circulation | 1208.00 | 1208.00 |
For data sources see[6]