X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0826070110002

Well Details

Well ID: 0826070110002
Loading map...
Location: 00/10-01-082-07W6/2
Location Alias: 00/10-01-82-07 W6M
Location Alias 2: 00/10-01-082-07 W6/02
Country: Canada
Province: Alberta
Township: 082
Meridian: 6
Range: 07
Section: 01
County/Municipality: Saddle Hills County
Well Name: CEQUENCE BLUEB 10-1-82-7
Operator Name: Cequence Energy Ltd.
License Number: 0209983
License Date: 1997-12-08
License Status: Abandoned
Spud Date: 1998-01-25
Final Drill Date: 1998-01-29
Well Total Depth: 1220.00 m
Surface Hole Latitude: 56.083029
Surface Hole Longitude: -118.948931

For data sources see[1][2]

Well History

Date Event
1997-12-08 Obtained License
1998-01-25 Surface Casing Operation Performed
1998-01-29 Drill Stem Test Performed
1998-01-29 Finished Drilling
1998-01-29 Well Log Performed
1998-01-29 Well Mode changed to Drilled and Cased
1998-01-31 Production Casing Operation Performed
1998-02-01 Rig Released
1998-02-04 Perforation Treatment Performed - Jet Perforation
1998-02-04 Well Log Performed
1999-08-22 Perforation Treatment Performed - Chemical Squeeze
1999-08-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-08-23 Plug Back Performed
1999-08-23 Well Log Performed
1999-08-24 Perforation Treatment Performed - Jet Perforation
1999-08-24 Well Log Performed
1999-08-24 Well Mode changed to Drilled and Cased
1999-09-01 Well Began Production
1999-09-01 Well Fluid changed to Gas
1999-09-01 Well Mode changed to Flowing
2000-04-03 Well Fluid changed to Gas
2000-04-03 Well Mode changed to Suspended
2005-10-23 Perforation Treatment Performed - Cement Squeeze
2005-10-23 Plug Back Performed
2005-10-23 Well Fluid changed to Gas
2005-10-23 Well Mode changed to Abandoned Zone
2005-10-26 Perforation Treatment Performed - Jet Perforation
2005-10-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-10-31 Plug Back Performed
2015-10-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-10-04 Plug Back Performed
2015-10-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-10-05 Plug Back Performed
2015-10-15 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-02-04 Perforation 1135.00 1138.00 18
2015-10-05 Packing Device Capped w/Cement 542.00 550.00 0
1999-08-22 Chemical Squeeze 1135.00 1138.00 0
1999-08-23 Packing Device Capped w/Cement 1132.00 1133.00 0
1999-08-24 Perforation 554.50 555.50 18
1999-08-24 Perforation 573.00 574.00 18
2005-10-23 Cement Squeeze 554.50 574.00 0
2005-10-26 Perforation 627.50 628.50 17
2005-10-31 Packing Device Capped w/Cement 612.00 620.00 0
2015-10-04 Packing Device Capped w/Cement 550.00 569.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 80 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-10-15 No Incident Encountered 0.00 0.00

For data sources see[6]

References