X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0826052911002

Well Details

Well ID: 0826052911002
Loading map...
Location: 00/11-29-082-05W6/2
Location Alias: 00/11-29-82-05 W6M
Location Alias 2: 00/11-29-082-05 W6/02
Country: Canada
Province: Alberta
Township: 082
Meridian: 6
Range: 05
Section: 29
County/Municipality: Municipal District of Fairview No. 136
Well Name: RAX ET AL GEORGE 11-29-82-5
Operator Name: Canadian Natural Resources Limited
License Number: 0055707
License Date: 1975-11-05
License Status: Suspension
Spud Date: 1975-11-08
Final Drill Date: 1975-12-22
Well Total Depth: 2229.60 m
Surface Hole Latitude: 56.141087
Surface Hole Longitude: -118.749844

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-11-05 Obtained License
1975-11-19 Lost Circulation Occurred
1975-11-25 Lost Circulation Occurred
1975-12-19 Drill Stem Test Performed
1975-12-22 Finished Drilling
1975-12-22 Well Mode changed to Drilled and Cased
1975-12-24 Drill Stem Test Performed
1975-12-26 Drill Stem Test Performed
1975-12-27 Production Casing Operation Performed
1976-01-09 Perforation Treatment Performed - Jet Perforation
1976-01-15 Perforation Treatment Performed - Jet Perforation
1976-01-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-01-17 Perforation Treatment Performed - Cement Squeeze
1976-01-18 Perforation Treatment Performed - Jet Perforation
1976-01-20 Perforation Treatment Performed - Cement Squeeze
1976-07-01 Well Fluid changed to Gas
1976-07-01 Well Mode changed to Testing
1976-07-13 Perforation Treatment Performed - Jet Perforation
1976-07-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1976-07-24 Perforation Treatment Performed - Jet Perforation
1998-10-15 Well Log Performed
2008-09-30 Well Fluid changed to Gas
2008-09-30 Well Mode changed to Test Completed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-01-09 Perforation 1457.60 1458.80 7
1976-07-13 Perforation 2114.10 2120.80 3
1976-07-23 Packing Device Capped w/Cement 2103.10 2103.10 0
1976-07-24 Perforation 1521.00 1522.20 7
1976-01-09 Perforation 1460.00 1460.90 7
1976-01-09 Perforation 1462.10 1464.60 7
1976-01-09 Perforation 1466.10 1466.70 7
1976-01-15 Perforation 900.40 901.00 7
1976-01-16 Acid Treatment 900.40 901.00 0
1976-01-17 Cement Squeeze 900.40 901.00 0
1976-01-18 Perforation 493.20 493.80 7
1976-01-20 Cement Squeeze 493.20 493.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 85 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1975-11-19 Lost Circulation 152.40 152.40
1975-11-25 Lost Circulation 190.20 190.20

For data sources see[6]

References