X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0826033606000

Well Details

Well ID: 0826033606000
Loading map...
Location: 00/06-36-082-03W6/0
Location Alias: 00/06-36-82-03 W6M
Location Alias 2: 00/06-36-082-03 W6/00
Country: Canada
Province: Alberta
Township: 082
Meridian: 6
Range: 03
Section: 36
County/Municipality: Municipal District of Fairview No. 136
Well Name: CNRL ET AL GAGE 6-36-82-3
Operator Name: Canadian Natural Resources Limited
License Number: 0062644
License Date: 1977-02-08
License Status: Abandoned
Spud Date: 1977-02-10
Final Drill Date: 1977-02-24
Well Total Depth: 1578.90 m
Surface Hole Latitude: 56.152029
Surface Hole Longitude: -118.329563

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-02-08 Obtained License
1977-02-16 Drill Stem Test Performed
1977-02-21 Drill Stem Test Performed
1977-02-24 Finished Drilling
1977-02-25 Drill Stem Test Performed
1977-02-26 Drill Stem Test Performed
1977-02-27 Drill Stem Test Performed
1977-02-28 Drill Stem Test Performed
1977-03-01 Production Casing Operation Performed
1977-03-02 Well Mode changed to Drilled and Cased
1977-05-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-05-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-05-23 Perforation Treatment Performed - Jet Perforation
1999-11-13 Well Log Performed
1999-11-14 Perforation Treatment Performed - Jet Perforation
2004-06-04 Well Fluid changed to Gas
2004-06-04 Well Mode changed to Testing
2004-10-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-10-20 Plug Back Performed
2004-10-20 Well Log Performed
2004-10-20 Well Mode changed to Abandoned Zone
2004-10-21 Perforation Treatment Performed - Jet Perforation
2004-10-21 Well Log Performed
2004-10-24 Well Log Performed
2004-10-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-10-25 Perforation Treatment Performed - Jet Perforation
2004-10-25 Plug Back Performed
2014-01-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-01-08 Plug Back Performed
2014-01-08 Well Log Performed
2014-01-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-01-09 Plug Back Performed
2014-01-09 Well Log Performed
2016-12-16 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-05-23 Perforation 1094.20 1095.50 7
2004-10-25 Packing Device Capped w/Cement 971.00 979.00 0
2004-10-25 Perforation 593.40 595.00 17
2014-01-08 Packing Device Capped w/Cement 934.00 942.00 0
2014-01-09 Packing Device Capped w/Cement 581.00 589.00 0
1977-05-23 Packing Device Capped w/Cement 1091.20 1091.20 0
1977-05-23 Perforation 1063.80 1065.00 7
1977-05-23 Acid Treatment 1063.80 1065.00 0
1999-11-14 Perforation 1063.80 1065.00 20
1999-11-14 Perforation 1065.90 1066.80 20
2004-10-20 Packing Device Capped w/Cement 1052.00 1060.00 0
2004-10-21 Perforation 985.10 987.00 17
2004-10-21 Perforation 952.20 953.40 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 16 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-01-10 No Incident Encountered 0.00 0.00

For data sources see[6]

References