X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0826021402002

Well Details

Well ID: 0826021402002
Loading map...
Location: 00/02-14-082-02W6/2
Location Alias: 00/02-14-82-02 W6M
Location Alias 2: 00/02-14-082-02 W6/02
Country: Canada
Province: Alberta
Township: 082
Meridian: 6
Range: 02
Section: 14
County/Municipality: Municipal District of Fairview No. 136
Well Name: CAVALIER WHITELAW 2-14-82-2
Operator Name: Cavalier Energy Limited
License Number: 0001358
License Date: 1950-04-14
License Status: RecCertified
Spud Date: 1950-05-15
Final Drill Date: 1950-08-13
Well Total Depth: 2283.60 m
Surface Hole Latitude: 56.103484
Surface Hole Longitude: -118.192917

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-04-14 Obtained License
1950-05-26 Drill Stem Test Performed
1950-05-28 Drill Stem Test Performed
1950-05-29 Drill Stem Test Performed
1950-05-31 Drill Stem Test Performed
1950-06-01 Drill Stem Test Performed
1950-06-02 Drill Stem Test Performed
1950-06-04 Drill Stem Test Performed
1950-06-05 Drill Stem Test Performed
1950-06-06 Drill Stem Test Performed
1950-06-07 Drill Stem Test Performed
1950-06-08 Drill Stem Test Performed
1950-06-09 Drill Stem Test Performed
1950-06-10 Drill Stem Test Performed
1950-06-25 Production Casing Operation Performed
1950-08-05 Drill Stem Test Performed
1950-08-09 Drill Stem Test Performed
1950-08-11 Drill Stem Test Performed
1950-08-13 Finished Drilling
1950-08-13 Well Mode changed to Drilled and Cased
1950-08-20 Perforation Treatment Performed - Jet Perforation
1950-08-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1950-12-20 Perforation Treatment Performed - Bullet Perforation
1950-12-22 Perforation Treatment Performed - Bullet Perforation
1950-12-24 Perforation Treatment Performed - Acid Wash - No Pressure
1951-01-02 Perforation Treatment Performed - Cement Squeeze
1951-01-07 Perforation Treatment Performed - Bullet Perforation
1951-01-09 Perforation Treatment Performed - Acid Wash - No Pressure
1957-10-28 Perforation Treatment Performed - Cement Squeeze
1957-10-29 Perforation Treatment Performed - Jet Perforation
1957-11-01 Well Began Production
1957-11-01 Well Fluid changed to Gas
1957-11-01 Well Mode changed to Flowing
1959-09-02 Well Fluid changed to Gas
1959-09-02 Well Mode changed to Suspended
1961-08-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-08-31 Perforation Treatment Performed - Jet Perforation
1961-09-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-09-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-09-18 Perforation Treatment Performed - Cement Plug
1961-09-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-09-19 Perforation Treatment Performed - Fractured
1963-07-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1963-07-18 Well Abandoned
1963-07-18 Well Fluid changed to Gas
1963-07-18 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-08-20 Perforation 1183.20 1191.80 16
1957-10-29 Perforation 1030.20 1033.30 13
1961-08-28 Acid Treatment 1030.20 1033.30 0
1961-08-31 Perforation 1051.60 1054.00 13
1961-08-31 Perforation 1057.70 1059.50 13
1961-08-31 Perforation 1070.50 1071.70 13
1961-09-04 Acid Treatment 1051.60 1071.70 0
1961-09-18 Acid Treatment 1057.70 1071.70 0
1961-09-18 Cement Plug 1064.10 1073.50 0
1961-09-19 Acid Treatment 1051.60 1059.50 0
1961-09-19 Fracture 1051.60 1059.50 0
1950-08-23 Acid Treatment 1183.20 1191.80 0
1963-07-13 Packing Device Capped w/Cement 993.60 1059.50 0
1950-12-20 Bullet Perforation 1183.20 1185.40 13
1950-12-22 Bullet Perforation 1185.40 1188.10 13
1950-12-24 Acid Wash 1183.20 1188.10 0
1951-01-02 Cement Squeeze 1183.20 1191.80 0
1951-01-07 Bullet Perforation 1183.20 1187.50 13
1951-01-09 Acid Wash 1183.20 1187.50 0
1957-10-28 Cement Squeeze 1183.20 1191.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References