If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0825091516002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.115979,"lon":-115.309504,"icon":""}]} |
Location: 00/16-15-082-09W5/2 | |
Location Alias: 00/16-15-82-09 W5M | |
Location Alias 2: 00/16-15-082-09 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 082 | |
Meridian: 5 | |
Range: 09 | |
Section: 15 | |
County/Municipality: Northern Sunrise County | |
Well Name: VERMILION ET AL UTIKUMA 16-15-82-9 | |
Operator Name: Vermilion Energy Inc. | |
License Number: 0170994 | |
License Date: 1994-09-30 | |
License Status: Suspension | |
Spud Date: 1994-10-18 | |
Final Drill Date: 1994-10-27 | |
Well Total Depth: 1765.00 m | |
Surface Hole Latitude: 56.115979 | |
Surface Hole Longitude: -115.309504 |
Date | Event |
---|---|
1994-09-30 | Obtained License |
1994-10-18 | Well Log Performed |
1994-10-19 | Surface Casing Operation Performed |
1994-10-24 | Direction Drilling Operation Performed - Deviate |
1994-10-27 | Finished Drilling |
1994-10-27 | Lost Circulation Occurred |
1994-10-27 | Well Log Performed |
1994-10-27 | Well Mode changed to Drilled and Cased |
1994-10-28 | Drill Stem Test Performed |
1994-10-28 | Well Log Performed |
1994-10-30 | Production Casing Operation Performed |
1994-10-31 | Rig Released |
1994-11-07 | Well Log Performed |
1994-11-08 | Perforation Treatment Performed - Jet Perforation |
2000-01-28 | Perforation Treatment Performed - Jet Perforation |
2000-01-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2000-02-03 | Well Began Production |
2000-02-03 | Well Fluid changed to Crude Oil |
2000-02-03 | Well Mode changed to Pumping |
2000-02-04 | Well Fluid changed to Crude Oil |
2000-02-04 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1994-10-24 | 1325.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1994-11-08 | Perforation | 1738.50 | 1741.00 | 13 |
2000-01-28 | Perforation | 1735.00 | 1737.00 | 17 |
2000-01-31 | Acid Treatment | 1735.00 | 1737.00 | 0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1994-10-27 | Lost Circulation | 1745.00 | 1745.00 |
For data sources see[6]