X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0825091415002

Well Details

Well ID: 0825091415002
Loading map...
Location: 00/15-14-082-09W5/2
Location Alias: 00/15-14-82-09 W5M
Location Alias 2: 00/15-14-082-09 W5/02
Country: Canada
Province: Alberta
Township: 082
Meridian: 5
Range: 09
Section: 14
County/Municipality: Northern Sunrise County
Well Name: PALOMA ET AL UTIKUMA 15-14-82-9
Operator Name: Sunoma Energy Corp.
License Number: 0169505
License Date: 1994-08-15
License Status: RecCertified
Spud Date: 1994-08-29
Final Drill Date: 1994-09-19
Well Total Depth: 1787.00 m
Surface Hole Latitude: 56.113823
Surface Hole Longitude: -115.290316

For data sources see[1][2]

Well History

Date Event
1994-08-15 Obtained License
1994-08-29 Well Log Performed
1994-08-30 Surface Casing Operation Performed
1994-09-03 Direction Drilling Operation Performed - Deviate
1994-09-15 Direction Drilling Operation Performed - Deviate
1994-09-19 Finished Drilling
1994-09-21 Drill Stem Test Performed
1994-09-22 Well Log Performed
1994-09-24 Production Casing Operation Performed
1994-09-24 Rig Released
1994-10-05 Perforation Treatment Performed - Jet Perforation
1994-10-06 Well Log Performed
1994-10-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-10-07 Perforation Treatment Performed - Jet Perforation
1994-11-09 Well Mode changed to Drilled and Cased
1995-06-11 Well Log Performed
1995-06-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-06-12 Plug Back Performed
1995-06-12 Well Abandoned
1995-06-12 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-09-03 1141.00 Deviate (5 - 79 degrees)
1994-09-15 1283.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-10-05 Perforation 1753.50 1763.50 13
1994-10-05 Perforation 1764.30 1771.90 13
1994-10-07 Perforation 1766.50 1771.50 13
1994-10-07 Acid Treatment 1753.50 1771.90 0
1995-06-12 Packing Device Capped w/Cement 1734.00 1742.00 0

For data sources see[5]



References