X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0825090703000

Well Details

Well ID: 0825090703000
Loading map...
Location: 00/03-07-082-09W5/0
Location Alias: 00/03-07-82-09 W5M
Location Alias 2: 00/03-07-082-09 W5/00
Country: Canada
Province: Alberta
Township: 082
Meridian: 5
Range: 09
Section: 07
County/Municipality: Northern Sunrise County
Well Name: PEX ESSO UTIKUMA 3-7-82-9
Operator Name: Suncor Energy Inc.
License Number: 0091088
License Date: 1981-07-07
License Status: RecCertified
Spud Date: 1981-07-20
Final Drill Date: 1981-07-31
Well Total Depth: 1735.00 m
Surface Hole Latitude: 56.090399
Surface Hole Longitude: -115.402514

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-07-07 Obtained License
1981-07-31 Finished Drilling
1981-08-02 Production Casing Operation Performed
1981-08-03 Well Mode changed to Drilled and Cased
1981-08-28 Perforation Treatment Performed - Jet Perforation
1981-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-10-17 Well Began Production
1981-10-17 Well Fluid changed to Crude Oil
1981-10-17 Well Mode changed to Pumping
1981-11-16 Perforation Treatment Performed - Jet Perforation
1981-11-18 Perforation Treatment Performed - Fractured
1984-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-08-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-08-31 Perforation Treatment Performed - Jet Perforation
1984-08-31 Plug Back Performed
1984-08-31 Well Fluid changed to Crude Oil
1984-08-31 Well Mode changed to Abandoned Zone
1988-07-11 Perforation Treatment Performed - Jet Perforation
1988-07-14 Perforation Treatment Performed - Casing Patch (Over Perfs)
1988-07-14 Perforation Treatment Performed - Jet Perforation
1988-07-14 Well Log Performed
1988-07-16 Perforation Treatment Performed - Chemical Squeeze
1988-08-01 Well Fluid changed to Crude Oil
1988-08-01 Well Mode changed to Pumping
1989-04-01 Well Fluid changed to Crude Oil
1989-04-01 Well Mode changed to Suspended
1989-06-29 Perforation Treatment Performed - Cement Squeeze
1989-06-29 Plug Back Performed
1989-06-29 Well Abandoned
1989-06-29 Well Fluid changed to Crude Oil
1989-06-29 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-08-28 Perforation 1715.00 1718.00 13
1988-07-14 Casing Patch 1633.50 1635.00 0
1988-07-16 Chemical Squeeze 1714.00 1718.00 0
1989-06-29 Cement Squeeze 1714.00 1718.00 0
1981-08-31 Acid Treatment 1715.00 1718.00 0
1981-11-16 Perforation 1715.00 1718.00 13
1981-11-18 Fracture 1715.00 1718.00 0
1984-08-31 Packing Device Capped w/Cement 1705.00 1705.00 0
1984-08-31 Perforation 1633.50 1635.00 13
1984-08-31 Acid Treatment 1633.50 1635.00 0
1988-07-11 Perforation 1715.00 1718.00 13
1988-07-14 Perforation 1714.00 1718.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 72 0.0 0.0 0.0
1982 5532 0.0 0.0 0.0
1983 4860 0.0 0.0 0.0
1984 2881 0.0 0.0 0.0
1988 3120 0.0 0.0 0.0
1989 1680 0.0 0.0 0.0

For data sources see[5]

References