X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0824122714AB0

Well Details

Well ID: 0824122714AB0
Loading map...
Location: AB/14-27-082-12W4/0
Location Alias: AB/14-27-82-12 W4M
Location Alias 2: AB/14-27-082-12 W4/00
Country: Canada
Province: Alberta
Township: 082
Meridian: 4
Range: 12
Section: 27
County/Municipality: Regional Municipality of Wood Buffalo
Well Name: CONNACHER DIVIDE 14-27-82-12
Operator Name: Connacher Oil And Gas Limited
License Number: 0416078
License Date: 2009-12-22
License Status: Abandoned
Spud Date: 2010-01-14
Final Drill Date: 2010-01-28
Well Total Depth: 493.00 m
Surface Hole Latitude: 56.143136
Surface Hole Longitude: -111.797010

For data sources see[1][2]

Well History

Date Event
2009-12-22 Obtained License
2010-01-15 Surface Casing Operation Performed
2010-01-28 Finished Drilling
2010-01-28 Production Casing Operation Performed
2010-01-28 Well Log Performed
2010-01-29 Rig Released
2010-02-10 Perforation Treatment Performed - Fractured
2010-02-10 Perforation Treatment Performed - Jet Perforation
2010-02-10 Well Log Performed
2010-02-11 Perforation Treatment Performed - Jet Perforation
2010-02-11 Well Log Performed
2010-02-12 Perforation Treatment Performed - Fractured
2010-02-13 Perforation Treatment Performed - Fractured
2010-02-13 Perforation Treatment Performed - Jet Perforation
2010-02-14 Perforation Treatment Performed - Fractured
2010-02-14 Perforation Treatment Performed - Jet Perforation
2010-02-18 Perforation Treatment Performed - Cement Plug
2010-02-18 Plug Back Performed
2010-02-18 Well Log Performed
2010-02-20 Perforation Treatment Performed - Cement Plug
2010-02-20 Plug Back Performed
2010-02-20 Well Mode changed to Abandoned
2010-03-06 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-02-10 Perforation 461.00 466.00 20
2010-02-18 Cement Plug 397.00 412.00 0
2010-02-20 Cement Plug 0.00 386.00 0
2010-02-10 Fracture 461.00 466.00 0
2010-02-11 Perforation 449.00 452.00 20
2010-02-12 Fracture 449.00 452.00 0
2010-02-13 Perforation 417.50 420.50 20
2010-02-13 Fracture 417.50 420.50 0
2010-02-14 Perforation 390.00 395.00 20
2010-02-14 Fracture 390.00 395.00 0
2010-02-18 Cement Plug 431.00 446.00 0

For data sources see[4]



References