X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0824110515004

Well Details

Well ID: 0824110515004
Loading map...
Location: 00/15-05-082-11W4/4
Location Alias: 00/15-05-82-11 W4M
Location Alias 2: 00/15-05-082-11 W4/04
Country: Canada
Province: Alberta
Township: 082
Meridian: 4
Range: 11
Section: 05
County/Municipality: Regional Municipality of Wood Buffalo
Well Name: CLL HANGSTN 15-5-82-11
Operator Name: Connacher Oil And Gas Limited
License Number: 0265329
License Date: 2001-12-27
License Status: Abandoned
Spud Date: 2002-01-03
Final Drill Date: 2002-01-07
Well Total Depth: 534.00 m
Surface Hole Latitude: 56.083219
Surface Hole Longitude: -111.685535

For data sources see[1][2]

Well History

Date Event
2001-12-27 Obtained License
2002-01-03 Surface Casing Operation Performed
2002-01-07 Finished Drilling
2002-01-07 Well Log Performed
2002-01-07 Well Mode changed to Drilled and Cased
2002-01-08 Production Casing Operation Performed
2002-01-08 Rig Released
2002-01-14 Perforation Treatment Performed - Jet Perforation
2002-01-14 Well Log Performed
2002-02-07 Perforation Treatment Performed - Jet Perforation
2002-02-07 Well Log Performed
2006-03-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-03-02 Plug Back Performed
2006-03-03 Well Log Performed
2006-03-04 Perforation Treatment Performed - Jet Perforation
2006-03-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-03-05 Plug Back Performed
2006-03-05 Well Mode changed to Abandoned Zone
2006-03-08 Well Abandoned
2006-03-08 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-01-14 Perforation 497.50 498.50 20
2002-01-14 Perforation 494.80 495.80 20
2002-02-07 Perforation 486.30 487.50 20
2002-02-07 Perforation 481.80 482.50 20
2002-02-07 Perforation 470.00 471.00 20
2006-03-02 Packing Device Capped w/Cement 399.00 494.00 0
2006-03-04 Perforation 268.00 269.00 20
2006-03-04 Perforation 270.50 271.50 20
2006-03-05 Packing Device Capped w/Cement 252.00 260.00 0

For data sources see[4]



References