X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0816132610000

Well Details

Well ID: 0816132610000
Loading map...
Location: 00/10-26-081-13W6/0
Location Alias: 00/10-26-81-13 W6M
Location Alias 2: 00/10-26-081-13 W6/00
Country: Canada
Province: Alberta
Township: 081
Meridian: 6
Range: 13
Section: 26
County/Municipality: Saddle Hills County
Well Name: GLENOGLE DOE 10-26-81-13
Operator Name: Glenogle Energy Inc.
License Number: 0116397
License Date: 1985-07-24
License Status: Abandoned
Spud Date: 1985-08-03
Final Drill Date: 1985-08-31
Well Total Depth: 2482.00 m
Surface Hole Latitude: 56.052374
Surface Hole Longitude: -119.917801

For data sources see[1][2]

Well History

Date Event
1985-07-24 Obtained License
1985-08-04 Lost Circulation Occurred
1985-08-06 Surface Casing Operation Performed
1985-08-31 Finished Drilling
1985-08-31 Well Mode changed to Drilled and Cased
1985-09-01 Well Log Performed
1985-09-03 Drill Stem Test Performed
1985-09-05 Production Casing Operation Performed
1985-09-06 Rig Released
1985-09-09 Well Log Performed
1985-10-15 Well Began Production
1985-10-15 Well Fluid changed to Gas
1985-10-15 Well Mode changed to Flowing
1986-12-07 Perforation Treatment Performed - Jet Perforation
1986-12-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-12-12 Perforation Treatment Performed - Cement Squeeze
1986-12-13 Well Fluid changed to Gas
1986-12-13 Well Mode changed to Suspended
1994-01-11 Well Log Performed
1994-01-12 Perforation Treatment Performed - Jet Perforation
1994-01-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-01-15 Perforation Treatment Performed - Cement Squeeze
1994-01-19 Perforation Treatment Performed - Jet Perforation
1994-01-19 Well Log Performed
1994-01-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-01-25 Well Log Performed
1994-01-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-01-26 Plug Back Performed
2000-02-18 Well Abandoned
2000-02-18 Well Fluid changed to Gas
2000-02-18 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-12-07 Perforation 2382.00 2384.00 13
1994-01-22 Acid Treatment 2382.00 2389.00 0
1994-01-26 Packing Device Capped w/Cement 2362.00 2370.00 0
1986-12-07 Perforation 2386.00 2389.00 13
1986-12-08 Acid Treatment 2382.00 2389.00 0
1986-12-12 Cement Squeeze 2382.00 2389.00 0
1994-01-12 Perforation 2390.50 2394.00 13
1994-01-13 Acid Treatment 2390.50 2394.00 0
1994-01-15 Cement Squeeze 2390.50 2394.00 0
1994-01-19 Perforation 2382.00 2384.00 14
1994-01-19 Perforation 2386.00 2389.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 975 0.0 0.0 0.0
1986 4471 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1985-08-04 Lost Circulation 62.00 145.00

For data sources see[6]

References