X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0816132507003

Well Details

Well ID: 0816132507003
Loading map...
Location: 00/07-25-081-13W6/3
Location Alias: 00/07-25-81-13 W6M
Location Alias 2: 00/07-25-081-13 W6/03
Country: Canada
Province: Alberta
Township: 081
Meridian: 6
Range: 13
Section: 25
County/Municipality: Saddle Hills County
Well Name: GLENOGLE DOE 7-25-81-13
Operator Name: Glenogle Energy Inc.
License Number: 0067172
License Date: 1977-12-01
License Status: Abandoned
Spud Date: 1977-12-28
Final Drill Date: 1978-03-08
Well Total Depth: 3426.60 m
Surface Hole Latitude: 56.047701
Surface Hole Longitude: -119.887360

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-12-01 Obtained License
1977-12-28 Lost Circulation Occurred
1978-01-05 Kick Occurred
1978-01-17 Drill Stem Test Performed
1978-01-18 Drill Stem Test Performed
1978-01-19 Drill Stem Test Performed
1978-01-20 Drill Stem Test Performed
1978-01-26 Drill Stem Test Performed
1978-03-08 Finished Drilling
1978-03-08 Well Log Performed
1978-03-08 Well Mode changed to Drilled and Cased
1978-03-11 Drill Stem Test Performed
1978-03-12 Well Log Performed
1978-03-14 Production Casing Operation Performed
1979-02-04 Perforation Treatment Performed - Jet Perforation
1979-02-21 Perforation Treatment Performed - Jet Perforation
1979-02-21 Well Log Performed
1979-02-22 Perforation Treatment Performed - Fractured
1979-02-28 Perforation Treatment Performed - Cement Squeeze
1983-10-11 Perforation Treatment Performed - Jet Perforation
1992-09-22 Well Log Performed
1992-09-23 Perforation Treatment Performed - Cement Squeeze
1992-09-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-09-24 Plug Back Performed
1992-09-25 Well Log Performed
1992-09-26 Perforation Treatment Performed - Jet Perforation
1993-01-01 Well Began Production
1993-01-01 Well Fluid changed to Gas
1993-01-01 Well Mode changed to Flowing
1999-10-19 Well Fluid changed to Gas
1999-10-19 Well Mode changed to Suspended
2000-11-16 Perforation Treatment Performed - Jet Perforation
2000-11-17 Perforation Treatment Performed - Jet Perforation
2000-11-17 Well Log Performed
2000-11-23 Perforation Treatment Performed - Fractured
2000-11-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-11-27 Perforation Treatment Performed - Cement Squeeze
2000-11-28 Perforation Treatment Performed - Cement Squeeze
2001-01-11 Well Fluid changed to Gas
2001-01-11 Well Mode changed to Suspended
2012-09-05 Well Log Performed
2012-09-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-09-06 Plug Back Performed
2012-09-06 Well Fluid changed to Gas
2012-09-06 Well Log Performed
2012-09-06 Well Mode changed to Abandoned Zone
2012-09-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-09-07 Plug Back Performed
2012-09-07 Well Log Performed
2012-09-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-09-10 Perforation Treatment Performed - Jet Perforation
2012-09-10 Well Log Performed
2012-10-26 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-02-04 Perforation 2370.70 2385.00 7
2000-11-16 Perforation 1195.40 1200.20 13
2000-11-17 Perforation 1233.80 1235.80 18
2000-11-23 Fracture 1233.80 1235.80 0
2000-11-26 Acid Treatment 1097.90 1099.10 0
2000-11-26 Acid Treatment 1195.40 1200.20 0
2000-11-27 Cement Squeeze 1195.40 1200.20 0
2000-11-28 Cement Squeeze 1097.90 1099.10 0
2012-09-06 Packing Device Capped w/Cement 1217.00 1225.00 0
2012-09-07 Packing Device Capped w/Cement 1177.00 1185.00 0
2012-09-10 Perforation 717.00 720.00 13
1979-02-21 Perforation 1233.50 1240.00 7
2012-09-10 Packing Device Capped w/Cement 701.00 709.00 0
1979-02-22 Fracture 1233.50 1240.00 0
1979-02-28 Cement Squeeze 1233.50 1240.00 0
1983-10-11 Perforation 1195.40 1200.20 13
1992-09-23 Cement Squeeze 2370.70 2385.00 0
1992-09-24 Packing Device Capped w/Cement 2323.00 2331.00 0
1992-09-24 Packing Device Capped w/Cement 1181.00 1189.00 0
1992-09-26 Perforation 1097.90 1099.10 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 2239 0.0 0.0 0.0
1994 8062 0.0 0.0 0.0
1995 1698 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1977-12-28 Lost Circulation 61.00 152.00
1978-01-05 Kick 1109.50 1109.50
2012-10-26 No Incident Encountered 0.00 0.00

For data sources see[6]

References