X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0816123006000

Well Details

Well ID: 0816123006000
Loading map...
Location: 00/06-30-081-12W6/0
Location Alias: 00/06-30-81-12 W6M
Location Alias 2: 00/06-30-081-12 W6/00
Country: Canada
Province: Alberta
Township: 081
Meridian: 6
Range: 12
Section: 30
County/Municipality: Saddle Hills County
Well Name: GLENOGLE DOE 6-30-81-12
Operator Name: Glenogle Energy Inc.
License Number: 0069675
License Date: 1978-05-23
License Status: Abandoned
Spud Date: 1978-05-30
Final Drill Date: 1978-07-08
Well Total Depth: 2468.90 m
Surface Hole Latitude: 56.047605
Surface Hole Longitude: -119.871396

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-05-23 Obtained License
1978-07-08 Finished Drilling
1978-07-11 Drill Stem Test Performed
1978-07-12 Drill Stem Test Performed
1978-07-13 Drill Stem Test Performed
1978-07-14 Drill Stem Test Performed
1978-07-16 Production Casing Operation Performed
1978-07-19 Well Mode changed to Drilled and Cased
1979-02-15 Perforation Treatment Performed - Jet Perforation
1979-02-15 Well Log Performed
1981-12-01 Well Began Production
1981-12-01 Well Fluid changed to Gas
1981-12-01 Well Mode changed to Flowing
1983-03-01 Well Fluid changed to Gas
1983-03-01 Well Mode changed to Suspended
1983-04-27 Well Fluid changed to Gas
1983-04-27 Well Mode changed to Flowing
1984-05-10 Well Log Performed
1984-06-01 Well Log Performed
1985-05-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-05-05 Plug Back Performed
1985-05-05 Well Fluid changed to Gas
1985-05-05 Well Mode changed to Abandoned Zone
1985-05-07 Perforation Treatment Performed - Jet Perforation
1985-05-09 Perforation Treatment Performed - Cement Squeeze
1985-05-10 Perforation Treatment Performed - Jet Perforation
1985-05-10 Well Log Performed
1985-09-22 Perforation Treatment Performed - Cement Squeeze
1985-09-22 Plug Back Performed
1985-09-26 Perforation Treatment Performed - Jet Perforation
1992-09-22 Well Log Performed
1992-09-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-09-23 Plug Back Performed
1992-09-23 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-02-15 Perforation 2373.00 2380.00 7
1985-05-05 Packing Device Capped w/Cement 2357.00 2365.00 0
1985-05-07 Perforation 1255.00 1258.00 13
1985-05-09 Cement Squeeze 1255.00 1258.00 0
1985-05-10 Perforation 1235.00 1239.00 0
1985-09-22 Cement Squeeze 1235.00 1239.00 0
1985-09-26 Perforation 1450.00 1453.50 13
1992-09-23 Packing Device Capped w/Cement 1415.00 1423.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 738 0.0 0.0 0.0
1982 2746 0.0 0.0 0.0
1983 3579 0.0 0.0 0.0
1984 7732 0.0 0.0 0.0
1985 1276 0.0 0.0 0.0

For data sources see[5]

References