X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0816103408000

Well Details

Well ID: 0816103408000
Loading map...
Location: 00/08-34-081-10W6/0
Location Alias: 00/08-34-81-10 W6M
Location Alias 2: 00/08-34-081-10 W6/00
Country: Canada
Province: Alberta
Township: 081
Meridian: 6
Range: 10
Section: 34
County/Municipality: Saddle Hills County
Well Name: DAYLIGHT ET AL BALSAM 8-34-81-10
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0140956
License Date: 1989-09-18
License Status: Abandoned
Spud Date: 1989-09-29
Final Drill Date: 1989-10-17
Well Total Depth: 2130.00 m
Surface Hole Latitude: 56.061949
Surface Hole Longitude: -119.467922

For data sources see[1][2]

Well History

Date Event
1989-09-18 Obtained License
1989-10-01 Surface Casing Operation Performed
1989-10-06 Well Log Performed
1989-10-07 Drill Stem Test Performed
1989-10-17 Finished Drilling
1989-10-17 Well Log Performed
1989-10-19 Drill Stem Test Performed
1989-10-20 Drill Stem Test Performed
1989-10-21 Drill Stem Test Performed
1989-10-23 Production Casing Operation Performed
1989-10-24 Rig Released
1989-10-24 Well Mode changed to Drilled and Cased
1994-03-12 Perforation Treatment Performed - Jet Perforation
1994-07-26 Perforation Treatment Performed - Jet Perforation
1994-07-26 Well Log Performed
1994-07-27 Perforation Treatment Performed - Jet Perforation
1995-08-03 Well Mode changed to Drilled and Cased
1998-10-24 Perforation Treatment Performed - Cement Squeeze
1998-10-24 Plug Back Performed
1998-11-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-11-20 Well Began Production
1998-11-20 Well Fluid changed to Gas
1998-11-20 Well Mode changed to Flowing
1998-11-21 Well Fluid changed to Gas
1998-11-21 Well Mode changed to Flowing
2010-10-01 Well Fluid changed to Gas
2010-10-01 Well Mode changed to Suspended
2017-10-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-10-08 Plug Back Performed
2017-10-08 Well Fluid changed to Gas
2017-10-08 Well Mode changed to Abandoned Zone
2017-10-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-10-09 Plug Back Performed
2017-10-09 Well Log Performed
2017-10-10 Perforation Treatment Performed - Jet Perforation
2017-10-10 Well Log Performed
2017-10-11 Perforation Treatment Performed - Cement Plug
2017-10-11 Perforation Treatment Performed - Cement Squeeze
2017-10-11 Plug Back Performed
2017-10-28 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-03-12 Perforation 1409.00 1410.00 13
2017-10-11 Cement Squeeze 507.00 509.00 0
2017-10-11 Cement Plug 484.30 496.60 0
1994-07-26 Perforation 1305.00 1306.50 17
1994-07-27 Perforation 1147.00 1151.00 14
1998-10-24 Cement Squeeze 1147.00 1151.00 0
1998-11-11 Acid Treatment 1305.00 1306.50 0
2017-10-08 Packing Device Capped w/Cement 1388.00 1396.00 0
2017-10-08 Packing Device Capped w/Cement 1286.00 1295.00 0
2017-10-09 Packing Device Capped w/Cement 1129.00 1137.00 0
2017-10-10 Perforation 507.00 509.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 1004 0.0 0.0 0.0
1999 7897 0.0 0.0 0.0
2000 5271 0.0 0.0 0.0
2001 1871 0.0 0.0 0.0
2002 1466 0.0 0.0 0.0
2003 2227 0.0 0.0 0.0
2004 1882 0.0 0.0 0.0
2005 7319 0.0 0.0 0.0
2006 5879 0.0 0.0 0.0
2007 189 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-10-10 No Incident Encountered 0.00 0.00
2017-10-12 No Incident Encountered 0.00 0.00

For data sources see[6]

References