X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0816103006002

Well Details

Well ID: 0816103006002
Loading map...
Location: 00/06-30-081-10W6/2
Location Alias: 00/06-30-81-10 W6M
Location Alias 2: 00/06-30-081-10 W6/02
Country: Canada
Province: Alberta
Township: 081
Meridian: 6
Range: 10
Section: 30
County/Municipality: Saddle Hills County
Well Name: SLE BONANZA 6-30-81-10
Operator Name: SanLing Energy Ltd.
License Number: 0140449
License Date: 1989-07-24
License Status: Suspension
Spud Date: 1989-07-27
Final Drill Date: 1989-08-18
Well Total Depth: 2195.00 m
Surface Hole Latitude: 56.047557
Surface Hole Longitude: -119.557094

For data sources see[1][2]

Well History

Date Event
1989-07-24 Obtained License
1989-07-28 Surface Casing Operation Performed
1989-08-18 Finished Drilling
1989-08-18 Well Mode changed to Drilled and Cased
1989-08-19 Well Log Performed
1989-08-20 Well Log Performed
1989-08-22 Production Casing Operation Performed
1989-08-22 Rig Released
1989-10-31 Perforation Treatment Performed - Jet Perforation
1989-10-31 Well Log Performed
1991-05-16 Well Log Performed
1992-01-31 Well Log Performed
1993-11-23 Well Log Performed
1999-02-25 Well Log Performed
2003-03-28 Well Log Performed
2003-03-31 Perforation Treatment Performed - Cement Squeeze
2003-04-03 Perforation Treatment Performed - Jet Perforation
2003-04-03 Well Log Performed
2004-10-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-10-01 Perforation Treatment Performed - Jet Perforation
2004-10-01 Plug Back Performed
2004-10-01 Well Log Performed
2004-10-04 Perforation Treatment Performed - Fractured
2004-10-23 Well Began Production
2004-10-23 Well Fluid changed to Gas
2004-10-23 Well Mode changed to Flowing
2010-03-02 Perforation Treatment Performed - Jet Perforation
2010-03-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-03-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-03-06 Plug Back Performed
2010-03-06 Well Fluid changed to Gas
2010-03-06 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-10-31 Perforation 2110.50 2124.00 13
2003-03-31 Cement Squeeze 2110.50 2124.00 0
2003-04-03 Perforation 2110.50 2114.00 17
2004-10-01 Packing Device Capped w/Cement 2092.00 2100.00 0
2004-10-01 Perforation 1184.00 1190.00 20
2004-10-04 Fracture 1184.00 1190.00 0
2010-03-02 Perforation 1366.00 1368.00 17
2010-03-04 Acid Treatment 1366.00 1368.00 0
2010-03-06 Packing Device Capped w/Cement 1347.00 1355.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 1633 0.0 0.0 0.0
2005 8016 0.0 0.0 0.0
2006 8663 0.0 0.0 0.0
2007 629 0.0 0.0 0.0

For data sources see[5]

References