X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0816102013000

Well Details

Well ID: 0816102013000
Loading map...
Location: 00/13-20-081-10W6/0
Location Alias: 00/13-20-81-10 W6M
Location Alias 2: 00/13-20-081-10 W6/00
Country: Canada
Province: Alberta
Township: 081
Meridian: 6
Range: 10
Section: 20
County/Municipality: Saddle Hills County
Well Name: DAYLIGHT ET AL BONANZA 13-20-81-10
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0186310
License Date: 1996-02-28
License Status: RecCertified
Spud Date: 1996-03-25
Final Drill Date: 1996-04-12
Well Total Depth: 2201.00 m
Surface Hole Latitude: 56.041883
Surface Hole Longitude: -119.537602

For data sources see[1][2]

Well History

Date Event
1996-02-28 Obtained License
1996-03-26 Surface Casing Operation Performed
1996-04-12 Finished Drilling
1996-04-12 Well Log Performed
1996-04-13 Well Log Performed
1996-04-15 Production Casing Operation Performed
1996-04-17 Rig Released
1996-06-10 Well Log Performed
1996-06-11 Perforation Treatment Performed - Jet Perforation
1996-06-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-06-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-06-14 Perforation Treatment Performed - Jet Perforation
1996-06-14 Plug Back Performed
1996-06-14 Well Log Performed
1996-06-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-06-16 Plug Back Performed
1996-06-17 Perforation Treatment Performed - Jet Perforation
1996-06-17 Well Log Performed
1996-06-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-06-19 Plug Back Performed
1996-06-19 Well Log Performed
1997-07-24 Well Abandoned
1997-07-24 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-06-11 Perforation 2154.00 2158.00 18
1996-06-12 Acid Treatment 2154.00 2158.00 0
1996-06-14 Packing Device Capped w/Cement 2145.00 2153.00 0
1996-06-14 Perforation 2133.00 2137.00 18
1996-06-16 Packing Device Capped w/Cement 2123.00 2131.00 0
1996-06-17 Perforation 1460.00 1463.00 18
1996-06-19 Packing Device Capped w/Cement 1444.50 1452.50 0

For data sources see[4]



References