X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0816042115004

Well Details

Well ID: 0816042115004
Loading map...
Location: 00/15-21-081-04W6/4
Location Alias: 00/15-21-81-04 W6M
Location Alias 2: 00/15-21-081-04 W6/04
Country: Canada
Province: Alberta
Township: 081
Meridian: 6
Range: 04
Section: 21
County/Municipality: Municipal District of Fairview No. 136
Well Name: CNRL DUNVEG 15-21-81-4
Operator Name: Canadian Natural Resources Limited
License Number: 0172432
License Date: 1994-11-14
License Status: Suspension
Spud Date: 1994-11-14
Final Drill Date: 1994-11-24
Well Total Depth: 1683.00 m
Surface Hole Latitude: 56.042237
Surface Hole Longitude: -118.559047

For data sources see[1][2]

Well History

Date Event
1994-11-14 Obtained License
1994-11-14 Well Log Performed
1994-11-15 Lost Circulation Occurred
1994-11-16 Surface Casing Operation Performed
1994-11-24 Finished Drilling
1994-11-24 Well Mode changed to Drilled and Cased
1994-11-25 Well Log Performed
1994-11-26 Drill Stem Test Performed
1994-11-27 Drill Stem Test Performed
1994-11-29 Drill Stem Test Performed
1994-11-30 Drill Stem Test Performed
1994-12-01 Production Casing Operation Performed
1994-12-01 Rig Released
1995-07-07 Well Log Performed
1995-07-08 Perforation Treatment Performed - Jet Perforation
1995-07-08 Well Log Performed
1995-07-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-07-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-07-13 Plug Back Performed
1995-07-13 Well Log Performed
1995-07-14 Perforation Treatment Performed - Jet Perforation
1995-07-14 Well Log Performed
1995-07-15 Perforation Treatment Performed - Fractured
1995-07-20 Well Log Performed
1995-07-24 Well Log Performed
1995-07-26 Well Log Performed
1995-07-27 Perforation Treatment Performed - Jet Perforation
1995-07-27 Well Log Performed
1995-07-28 Well Log Performed
1995-07-30 Perforation Treatment Performed - Fractured
1998-10-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-10-30 Perforation Treatment Performed - Cement Squeeze
1998-10-30 Plug Back Performed
1998-11-01 Perforation Treatment Performed - Jet Perforation
1998-11-03 Well Log Performed
1998-11-04 Perforation Treatment Performed - Jet Perforation
1998-11-06 Perforation Treatment Performed - Fractured
1998-11-08 Well Log Performed
1998-11-09 Well Log Performed
1998-11-15 Well Log Performed
1998-11-17 Well Log Performed
1999-12-20 Well Log Performed
1999-12-21 Well Log Performed
1999-12-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-12-22 Plug Back Performed
2000-01-04 Well Log Performed
2000-01-05 Perforation Treatment Performed - Jet Perforation
2000-01-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-01-13 Well Began Production
2000-01-13 Well Fluid changed to Gas
2000-01-13 Well Mode changed to Flowing
2001-03-31 Well Fluid changed to Gas
2001-03-31 Well Mode changed to Suspended
2002-05-22 Well Fluid changed to Gas
2002-05-22 Well Mode changed to Flowing
2002-11-20 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-07-08 Perforation 1523.00 1527.00 14
1995-07-27 Perforation 1491.50 1494.00 14
1995-07-27 Perforation 1498.00 1501.50 14
1995-07-30 Fracture 1474.00 1501.50 0
1998-10-30 Cement Squeeze 1474.00 1501.50 0
1998-10-30 Packing Device Capped w/Cement 1454.80 1503.00 0
1998-11-01 Perforation 1373.00 1375.00 16
1998-11-04 Perforation 1071.00 1071.00 2
1998-11-04 Perforation 1070.00 1072.00 16
1998-11-04 Perforation 1065.00 1065.50 16
1998-11-06 Fracture 1065.00 1072.00 0
1995-07-08 Perforation 1529.50 1532.50 14
1999-12-22 Packing Device Capped w/Cement 1362.00 1370.00 0
2000-01-05 Perforation 1054.00 1054.00 2
2000-01-05 Perforation 1053.00 1055.00 17
2000-01-08 Acid Treatment 1053.00 1055.00 0
1995-07-08 Perforation 1535.00 1538.00 14
1995-07-09 Acid Treatment 1523.00 1538.00 0
1995-07-13 Packing Device Capped w/Cement 1519.00 1522.00 0
1995-07-14 Perforation 1504.00 1507.00 14
1995-07-14 Perforation 1509.00 1515.00 14
1995-07-15 Fracture 1504.00 1515.00 0
1995-07-27 Perforation 1474.00 1480.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 7547 0.0 0.0 0.0
2001 1340 0.0 0.0 0.0
2002 2440 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1994-11-15 Lost Circulation 191.00 317.00

For data sources see[6]

References