X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0816023601022

Well Details

Well ID: 0816023601022
Loading map...
Location: 02/01-36-081-02W6/2
Location Alias: 02/01-36-81-02 W6M
Location Alias 2: 02/01-36-081-02 W6/02
Country: Canada
Province: Alberta
Township: 081
Meridian: 6
Range: 02
Section: 36
County/Municipality: Municipal District of Fairview No. 136
Well Name: PETRUS WHITELAW 1-36-81-2
Operator Name: Tallahassee Exploration Inc.
License Number: 0243494
License Date: 2000-10-24
License Status: Issued
Spud Date: 2000-10-27
Final Drill Date: 2000-11-04
Well Total Depth: 1424.00 m
Surface Hole Latitude: 56.060759
Surface Hole Longitude: -118.160590

For data sources see[1][2]

Well History

Date Event
2000-10-24 Obtained License
2000-10-28 Surface Casing Operation Performed
2000-11-04 Finished Drilling
2000-11-04 Well Log Performed
2000-11-04 Well Mode changed to Drilled and Cased
2000-11-05 Well Log Performed
2000-11-06 Production Casing Operation Performed
2000-11-06 Rig Released
2000-11-10 Perforation Treatment Performed - Jet Perforation
2000-11-10 Well Log Performed
2000-11-11 Perforation Treatment Performed - Jet Perforation
2000-11-11 Well Log Performed
2000-11-12 Perforation Treatment Performed - Jet Perforation
2000-11-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-11-13 Perforation Treatment Performed - Jet Perforation
2000-11-13 Plug Back Performed
2000-11-13 Well Log Performed
2000-11-14 Perforation Treatment Performed - Jet Perforation
2000-11-14 Well Log Performed
2000-11-16 Perforation Treatment Performed - Jet Perforation
2000-11-16 Well Log Performed
2000-11-22 Well Began Production
2000-11-22 Well Fluid changed to Gas
2000-11-22 Well Mode changed to Flowing
2000-12-19 Well Log Performed
2008-07-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-02-01 Well Fluid changed to Gas
2012-02-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-11-10 Perforation 1386.50 1388.00 13
2000-11-13 Packing Device Capped w/Cement 1219.00 1227.00 0
2000-11-14 Perforation 1074.00 1075.00 13
2000-11-14 Perforation 976.00 979.00 13
2000-11-14 Perforation 980.00 981.00 13
2000-11-16 Perforation 882.00 883.20 13
2008-07-05 Acid Treatment 882.00 883.20 0
2000-11-10 Perforation 1389.50 1391.00 13
2000-11-11 Perforation 1372.70 1377.00 13
2000-11-11 Perforation 1353.00 1357.00 13
2000-11-11 Perforation 1349.00 1353.00 13
2000-11-12 Perforation 1344.00 1346.00 13
2000-11-12 Perforation 1320.00 1325.00 13
2000-11-12 Perforation 1315.00 1320.00 13
2000-11-13 Perforation 1256.00 1257.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 938 0.0 0.0 0.0
2001 8553 0.0 0.0 0.0
2002 8378 0.0 0.0 0.0
2003 8603 0.0 0.0 0.0
2004 2375 0.0 0.0 0.0

For data sources see[5]

References